Laserfiche WebLink
Planned Development Rezoning: <br />The overall project site contains ±84.62 (gross) acres, with ±66.58 acres inside the Urban Service Area <br />(USA) and ±18.04 acres outside the Urban Service Area. As allowed under the County's TND policies and <br />regulations, the developer is proposing to rezone the entire area to PDTND. Based on Section 915.21 of the <br />County's land development regulations (LDRs), the developer is required to go through the Planned <br />Development (PD) rezoning process to secure approval for the proposed TND project. <br />If the subject application is approved, the entire site will be rezoned to PDTND and will be governed by the <br />approved conceptual PD plan. <br />The PD Zoning District Generally: <br />In the past, the County has reviewed and approved PD rezonings involving both residential and non- <br />residential projects. Those include: Wal-Mart/Sam's, Vero Beach Square, Ansley Park, Arbor Trace, Old <br />Orchid Groves, Waterway Village, Pointe West, Providence Pointe, and Liberty Park. Similar to this <br />proposal, Pointe West, Sunnyside Up, Providence Pointe, and Liberty Park are PDTND zoned projects <br />designed for a mix of commercial and residential uses. <br />Unlike standard zoning districts, PD districts have no specific size or dimensional criteria. Instead, the PD <br />district is based on the underlying land use plan designation for density, use, and compatibility, with <br />allowances for development of TNDs to be located on portions of the project site that lie outside the Urban <br />Service Area. In the PD zoning district, setbacks and other typical zoning district criteria are established on <br />a site -by -site basis through approval of a conceptual PD plan that is adopted as part of the PD rezoning <br />ordinance. The conceptual PD plan, which in this case includes a TND design, serves as the zoning <br />standard for the site. <br />A PD rezoning requires the submission of a binding conceptual PD plan that, along with certain PD district <br />requirements, limits uses and sets forth specific development standards for each project site. Thus, a PD <br />rezoning allows a unique PD district that is consistent with the site's underlying land use designation(s) and <br />applicable land use policies to be developed for each project site. <br />In this case, the conceptual PD plan proposes up to 199 residential units and commercial, lodging, civic, <br />recreational, and open space uses within a TND layout. Aspects of the proposed conceptual PD plan, <br />including satisfaction of the TND design standards listed in LDR Section 915.21, are addressed in the "plan <br />analysis" section of this report. <br />The PD Rezoning Process: <br />The PD rezoning review, approval, and development process is as follows: <br />STEP 1. Rezoning and Conceptual PD Plan Approval: Review and recommendation made by staff <br />and by the PZC. Final action taken by the BCC. <br />STEP 2. Preliminary PD Plan/Plat (combination of site plan and preliminary plat) Approval: Review <br />and recommendation made by staff. Final action taken by the PZC. Must comply with the <br />approved conceptual PD plan and any conditions imposed by the BCC at the time of PD <br />zoning approval (Step 1). <br />103 <br />