Laserfiche WebLink
STEP 3. Land Development Permit (LDP) or LDP Waiver: Reviewed and issued by staff for <br />construction of subdivision improvements (road, utilities, drainage). <br />STEP 4. Building Permit(s): Reviewed and issued by staff for construction of buildings. <br />STEP 5. Final PD Plat Approval: Review and recommendation made by staff. Final action taken by <br />the BCC. <br />STEP 6. Certificate of Occupancy: Issued by staff (after inspections) for use and occupancy of <br />buildings. <br />The developer is seeking approval of Step 1 at this time. Once a conceptual PD plan is approved, only <br />minor modifications to the conceptual plan may be approved at a staff level. Any changes proposed to an <br />approved conceptual PD plan that would significantly reduce setbacks (by more than 20%), intensify the <br />site use (e.g. increase the maximum number of units), or reduce compatibility elements (e.g. reduce <br />buffering) may only be approved via a process involving public hearings held by both the PZC and the <br />BCC. <br />Proposed PD District for the Project Site: <br />For this project, most of the site (79%) is located inside the Urban Service Area, with only the western <br />portion located outside the Urban Service Area. Because this is a TND project, the TND criteria outlined <br />in Section 915.21 of the County LDRs control the allowed uses and density of the subject property. As with <br />all TNDs, the proposed PD zoning district and corresponding conceptual PD plan set limits on the type and <br />location of specific uses allowed, the intensity and location of development, and the dimensional criteria <br />for various blocks, tracts, and lots. Generally, the commercial uses allowed will be the uses listed as <br />permitted uses in the CL, Limited Commercial zoning district. Those commercial uses are proposed to be <br />located at the eastern end of the overall development, in the vicinity of the northwest corner of the 58th <br />Avenue/53rd Street intersection. <br />Although PD zoning district parameters are flexible, certain standards related to uses, compatibility <br />(buffering), infrastructure improvements, dimensional criteria and open space apply to all PDs. Those <br />standards are set forth in Chapter 915 (P.D. Ordinance) of the County LDRs. Based on the proposed <br />conceptual PD plan and Chapter 915, the proposed PD district for the subject site contains the special <br />elements identified in the tables below. The tables list various uses by zoning district (Table 1) and the <br />development parameters (Table 2) for comparison purposes. <br />Table 1: Use Table <br />104 <br />DISTRICTS <br />USES <br />ALLOWED <br />PROPOSED PD <br />DISTRICT <br />RS -3 DISTRICT <br />A-1 DISTRICT <br />Single -Family <br />Permitted <br />Permitted <br />Permitted <br />Multi -Family <br />Permitted <br />Not Allowed <br />Not Allowed <br />Personal Services <br />Permitted with Conditions <br />Limited to PD <br />Accessory <br />Limited to PD <br />Accessory <br />104 <br />