of the project site (see attachment 5). The final design of 53rd Street will be reviewed via the <br />LDP process for Phase 1. The timing of the 53rd Street improvements will be further outlined <br />prior to preliminary PD approval for Phase 1 or as outlined in a future Developer's <br />Agreement (if applicable). <br />c. Turn Lane Improvements for 53rd Street: The following turn lane improvements are required <br />for 53rd Street as outlined in the project's approved traffic impact study, and depicted on the <br />conceptual PD plan. The timing of the 53rd Street turn lane improvements will be further <br />outlined prior to preliminary PD approval for Phase 1 or as outlined in a future Developer's <br />Agreement (if applicable). <br />• Westbound right -turn lane at the project's full access connection to 53rd Street <br />• Eastbound left -turn lane at the project's full access connection to 53rd Street <br />• Westbound right -turn lane at the project's right-in/right-out connection to 53rd <br />Street <br />d. Drainage for 53rd Street: The developer has coordinated with Public Works, and has agreed <br />to accept stormwater runoff generated by the paving of 53rd Street. The stormwater design for <br />53rd Street will be reviewed via the LDP process for Phase 1 or as outlined in a future <br />Developer's Agreement (if applicable). <br />e. Right -of -Way Dedication for 58th Avenue: The County is currently designing a 58th Avenue <br />widening project between 49th Street and 57th Street. The developer has agreed to dedicate <br />ROW for 58th Avenue in order to accommodate the final design of the 58th Avenue widening <br />project. However, the final dedication width will not be determined until all survey and <br />design work has been completed. Therefore, the developer will need to obtain Public Works <br />approval on the final 58th Avenue ROW dedication prior to preliminary PD approval for <br />Phase 1. The 58th Avenue ROW dedication must be completed prior to the issuance of an <br />LDP for Phase 1 or as outlined in a future Developer's Agreement (if applicable). <br />f 53rd Street Sidewalk: A 5' wide sidewalk is required along the site's 53rd Street frontage. The <br />final design of the 53rd Street sidewalk will be reviewed and approved via the LDP for each <br />phase, and must be constructed prior to the issuance of a C. of C. for each respective phase or <br />as outlined in a future Developer's Agreement (if applicable). <br />58th Avenue Sidewalk: A 5' wide sidewalk is required along the site's 58th Avenue frontage. <br />The final design of the 58th Avenue sidewalk will be reviewed and approved via the LDP for <br />each phase, and must be constructed prior to the issuance of a C. of C. for each respective <br />phase or as outlined in a future Developer's Agreement (if applicable). <br />h. Internal Pedestrian System: The development will have an extensive sidewalk and <br />community trail system to facilitate pedestrian access through the project for residents and <br />users of the project's public areas. The pedestrian system will connect to the external <br />pedestrian system on 53rd Street. Portions of the community trail and internal sidewalk system <br />will be constructed with each phase. All sidewalks will be included in the LDP for each <br />phase, and will need to be constructed along the frontage of common areas and individual lots <br />in accordance with the requirements of LDR Section 913.09(5)(b)2. <br />g. <br />112 <br />