Laserfiche WebLink
18. Public Benefits: For all PD projects, applicants must identify the public benefits that the project <br />will provide in exchange for requested waivers or incentives being sought by the applicant. For the <br />proposed project, the public benefits provided over and above a conventional development plan are <br />as follows: <br />• Right -of -Way Dedication for 53rd Street: The developer has agreed to dedicate 5.52 acres of <br />right-of-way (ROW) for 53rd Street without compensation. Although the developer is <br />receiving density credit for the ROW dedication, they will not seek impact fee credits or other <br />forms of monetary compensation. The 53rd Street ROW dedication is a public benefit above <br />and beyond a less extensive dedication that would be typical of a conventional project. <br />• Drainage for 53rd Street: The developer has agreed to accept stormwater runoff generated by <br />the paving of 53rd Street, which will lessen the County's obligation construct stormwater <br />treatment facilities within the County ROW or acquire additional private property. <br />• Public Access: Certain interior streets will be privately dedicated but open to the public, and <br />will provide access to the limited commercial area and the hotel site. The proposed TND <br />design will offer limited commercial and personal services that are accessible to the residents <br />within the project as well as residents of nearby residential projects. <br />• Lakeside Amphitheater: The applicant will provide a lakeside amphitheater that will be <br />accessible to the public during public events. <br />19. Traditional Neighborhood Design (TND) Criteria: Section 915.21 of the County LDRs outline <br />the following TND criteria: <br />a. The minimum contiguous project site area shall be forty (40) acres. <br />Note: The project site is 85.62 acres, and exceeds the 40 acre minimum. <br />b. Land shall be under unified control, and it shall be planned and developed as a whole in a <br />single development or as an approved series of developments or neighborhoods. The project <br />shall be approved under the Planned Development (PD) rezoning process. <br />Note: The developer controls the entire 85.62 acres and is pursuing the PD rezoning process, a <br />process which requires a PD plan for the overall project. <br />c. In order to disperse traffic by offering many alternative routes and connections between <br />destinations within the project and to appropriate uses on adjacent sites, the street network <br />shall consist of a grid or modified grid pattern and shall accommodate vehicular and <br />pedestrian connections to adjacent streets, sidewalks, and to appropriate uses on adjacent <br />sites. <br />Note: The conceptual PD plan proposes a modified grid system throughout the project site with <br />roundabouts at key intersections and an extensive sidewalk/pedestrian system. The project design <br />provides multiple connections to 53rd Street but is restricted from extending roadways to the north <br />and east. <br />114 <br />