My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/21/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
01/21/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2023 9:22:44 AM
Creation date
6/17/2020 1:29:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/21/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Obtain Public Works approval of the final design for the stormwater improvements <br />required to accept stormwater runoff from 53rd Street, or as outlined in a <br />Developer's Agreement. <br />e. Obtain Public Works approval of the final design of the project's external 58th <br />Avenue sidewalk, or as outlined in a Developer's Agreement. <br />f. Provide a final design, acceptable to Traffic Engineering and MPO Staff, for the <br />project transit stop. <br />3. Prior to issuance of a land development permit for any respective phase, the developer <br />shall: <br />a. Obtain Planning staff approval of the final landscape plan for the respective phase. <br />b. Obtain Planning staff approval of the final streetlighting plan for the respective <br />phase. <br />c. Obtain Environmental Planning staff approval of the final tree protection and <br />mitigation plan for the respective phase. <br />4. Prior to issuance of a certificate of completion for Phase 1, the developer shall construct all <br />required 53rd Street improvements from 58th Avenue to the project's full access connection, <br />or as outlined in a Developer's Agreement. <br />5. Prior to issuance of a certificate of completion for any project phase or sub -phase, the <br />developer shall construct required improvements such as sidewalks and buffers that are tied <br />to that specific phase or sub -phase, or otherwise guarantee completion of the improvements <br />as provided for in the LDRs. <br />ATTACHMENTS: <br />1. Location Map <br />2. Aerial <br />3. Excerpt from Draft December 12, 2019 PZC Minutes <br />4. PDTND Rezoning Ordinance <br />5. Conceptual PD Plan <br />6. Conceptual Landscape Plan <br />119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.