My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116C
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 1:25:46 PM
Creation date
7/6/2020 11:10:11 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/23/2020
Control Number
2020-116C
Agenda Item Number
8.L.
Entity Name
Tetra Tech, Inc
Subject
Approve CCNA2018 Work Order 6 for the West Regional WWTF Florida
Department of Environmental Protection Operating Permit Renewal
Area
West Regional WWTF
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TETRATECH <br />Mr. Arjuna Weragoda, P.E. <br />Indian River County Department of Utility Services <br />June 2, 2020 <br />Page 6 <br />III. INFORMATION AND SERVICES TO BE PROVIDED BY IRCDUS <br />3. Provide requested data including permit application supplemental data noted above and all <br />WWTF operating data, service area description and map, O&M Manual and current <br />population projections. <br />4. Record drawings and WWTF design reports. <br />5. Provide access to treatment facilities sites. <br />IV. SERVICES NOT INCLUDED <br />The following items are not anticipated to be required for the permit renewal and are not <br />included in the scope of services. If needed they can be provided under a separate authorization. <br />1. An updated Agricultural Use Plan or Dedicated Site Plan as described in Chapter 62-640, F.A.0 <br />is required for a facility that uses land application as a method of residuals disposal - IRCDUS <br />West Regional WWTF transfers its biosolids to Indian River County Biosolids Dewatering <br />Facility and the receiving facility is responsible for the biosolids disposal: therefore not <br />included in this scope. <br />2. The collection system will not be evaluated as IRCDUS is not aware of treatment plant <br />problems resulting from the operation of collection and transmission facilities (such as <br />excessive infiltration/inflow, septic wastewater, introduction of toxic substances, or lack of <br />controls on industrial wastewater discharges to the collection system). <br />V. PROJECT SCHEDULE <br />The approximate duration noted for each task is based on our current understanding and best <br />estimates of time required to perform the basic services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.