My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116C
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 1:25:46 PM
Creation date
7/6/2020 11:10:11 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TETRATECH <br />Mr. Arjuna Weragoda, P.E. <br />Indian River County Department of Utility Services <br />June 2, 2020 <br />Page 6 <br />III. INFORMATION AND SERVICES TO BE PROVIDED BY IRCDUS <br />3. Provide requested data including permit application supplemental data noted above and all <br />WWTF operating data, service area description and map, O&M Manual and current <br />population projections. <br />4. Record drawings and WWTF design reports. <br />5. Provide access to treatment facilities sites. <br />IV. SERVICES NOT INCLUDED <br />The following items are not anticipated to be required for the permit renewal and are not <br />included in the scope of services. If needed they can be provided under a separate authorization. <br />1. An updated Agricultural Use Plan or Dedicated Site Plan as described in Chapter 62-640, F.A.0 <br />is required for a facility that uses land application as a method of residuals disposal - IRCDUS <br />West Regional WWTF transfers its biosolids to Indian River County Biosolids Dewatering <br />Facility and the receiving facility is responsible for the biosolids disposal: therefore not <br />included in this scope. <br />2. The collection system will not be evaluated as IRCDUS is not aware of treatment plant <br />problems resulting from the operation of collection and transmission facilities (such as <br />excessive infiltration/inflow, septic wastewater, introduction of toxic substances, or lack of <br />controls on industrial wastewater discharges to the collection system). <br />V. PROJECT SCHEDULE <br />The approximate duration noted for each task is based on our current understanding and best <br />estimates of time required to perform the basic services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.