My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116C
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 1:25:46 PM
Creation date
7/6/2020 11:10:11 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/23/2020
Control Number
2020-116C
Agenda Item Number
8.L.
Entity Name
Tetra Tech, Inc
Subject
Approve CCNA2018 Work Order 6 for the West Regional WWTF Florida
Department of Environmental Protection Operating Permit Renewal
Area
West Regional WWTF
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TETRATECH <br />Mr. Arjuna Weragoda, P.E. <br />Indian River County Department of Utility Services <br />June 2, 2020 <br />Page 5 <br />Task 7A: Capacity Analysis Report (Additional Services) <br />1. Per Chapter 62-600, F.A.C. in accordance with Section V.B of the current permit. Although the <br />WWTF three-month average daily flow has not exceeded 50% of the permitted capacity, due <br />to high organic load that exceeds the design for the WWTF an updated capacity analysis <br />report is required with the permit application. It is believed that this requirement was a result <br />of high loadings that were observed at the WWTF at the time of the previous renewal. <br />Subsequently, IRCDUS has mitigated the source of the high loadings. The influent loadings are <br />now consistent with the original plant design. Therefore, at the FDEP Pre -Application meeting <br />IRCDUS will request that this requirement be removed upon demonstration that the loadings <br />to the facilities are consistent with the original design. If FDEP requires that this permit <br />requirement be met as part of the renewal, Tetra Tech will prepare a Capacity Analysis <br />Report. <br />2. Develop flow projections for the next 10 -years based on historical wastewater flows and <br />population projections provided by IRCDUS. <br />3. Tetra Tech will summarize the finding in a draft technical memorandum. <br />4. Tetra Tech will meet with IRCDUS personnel to review findings. Tetra Tech will prepare and <br />distribute meeting summary to attendees. <br />5. Tetra Tech will finalize the technical memorandum in the Capacity Analysis Report. <br />5. Tetra Tech will prepare a draft Capacity Analysis Report (CAR) Tetra Tech will meet with <br />IRCDUS personnel to review findings. Tetra Tech will prepare and distribute meeting summary <br />to attendees. It is assumed that if required, the Capacity Analysis Report review meeting will <br />occur at the same time as the Operations Maintenance and Performance Report review <br />meeting. <br />6. Tetra Tech will finalize report to be submitted to FDEP. <br />Task 8A: Biosolids Storage Plan (Additional Services) <br />1. IRCDUS does not currently have a Facility Biosolids Storage Plan. IRCDUS West Regional <br />WWTF transfers its biosolids to Indian River County Biosolids Dewatering Facility and has not <br />been required to submit one to FDEP in the past. FDEP has required getting an approved <br />Facility Biosolids Plan on recent permit renewals for other facilities. If required by FDEP, Tetra <br />Tech will assist IRCDUS develop a Facilities Biosolids Plan which will include a summary of the <br />biosolids unit processes, disposal, and process back-up provisions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.