My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/28/1995
CBCC
>
Meetings
>
1990's
>
1995
>
3/28/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:21:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 94 Pr1E 7 -12 <br />Beth Mitchell and Don Donaldson <br />March <br />Page 8 <br />Some of the components of the -test plan are unnecessary and can <br />be eliminated without significantly effecting the analysis. The <br />current monitoring and associated data reduction and analysis <br />should be reduced. The shoals surveys and associated data <br />reduction and analysis could also be eliminated for further cost <br />savings. It is also not clear what the Phase III costs involve <br />and what reductions are possible. <br />There is no schedule provided in Section IV. <br />The plan refers to surveys every 4 months, but then uses the term <br />"quarterly surveys". <br />The proposed profile locations as provided by J. Bailey Smith <br />appear adequate, however, the information shall be submitted to <br />the Department in an acceptable format, (CAD files) so that <br />accurate drawings can be developed and used by all parties. The <br />information submitted is not acceptable as a baseline survey. <br />There are no provisions to provide the Department with <br />information or notification of execution of the various test plan <br />elements. The test plan refers to the Department as the <br />Department of Natural Resources. <br />The information submitted does not provide the Department with <br />the information to adequately assess the performance of the <br />proposed project pursuant to Section 27, Chapter 89-175, Laws of <br />Florida, Chapter 161.041, Florida Statutes and Chapter 628-41, <br />Florida Administrative code. <br />Based on review of the information which has been submitted, the <br />Department cannot recommend approval to the Secretary based on <br />the potential for significant adverse impacts to the coastal <br />system. <br />Sincerely, <br />Paden E. Woodruff, Senl6r Engineer <br />Bureau of Beaches and Coastal Systems <br />Enclosure <br />cc: Kirby B. Green III <br />Jeremy A. Craft <br />Alfred B. Devereaux <br />Hal Dean _ <br />Mark Leadon <br />Mike Sole <br />Eric Bush <br />Mike Ashey <br />David Ferrel (USFWS) <br />Mike Nowicki (ACOS) <br />Joan Pope (CERC) <br />J. Bailey Smith (CERC) <br />Steve Lewis <br />Gary Zarillo (FIT) <br />Bill Roberts <br />Tom Smith (ALOE) <br />Joe Gurule:(ACOE) <br />MARCH 28, 1995 <br />30 <br />h <br />
The URL can be used to link to this page
Your browser does not support the video tag.