My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/28/1995
CBCC
>
Meetings
>
1990's
>
1995
>
3/28/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:21:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: MARCH 16, 1995 <br />TO: HONORABLE BOARD OF COUNTY COMMISSIONERS <br />THRU: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: H.T. "SONNY" DEAN, DIRECTO <br />DEPARTMENT OF GENERAL SERVICE <br />SUBJECT: INDIAN RIVER COUNTY COURTHOUSE PROJECT <br />CHANGE ORDER NUMBER 18 <br />BACKGROUND: <br />This proposed change order to the contract between James A. <br />Cummings, Inc. and Indian River County is necessitated due to the <br />following construction changes on the subject project: <br />Item #1 Additional electrical conduit, devices $11,588.00 <br />for audio/visual equipment. (OWNER) <br />Item #2 Deletion of granite banding. (ARCHITECT) (2,918.00) <br />Item #3 Secure food pass slots added to holding 1,192.00 <br />cell doors. (ARCHITECT) <br />Item #4 Modifications along 21st Street per 8,806.00 <br />City of Vero Beach. (OWNER) <br />Item <br />#5 <br />Several non -fire doors changed to fire <br />2,435.00 <br />doors. (ARCHITECT) <br />Item <br />#6 <br />Power and communications requirements <br />5,545.00 <br />inadvertently omitted from documents in <br />J.A.'s area. (ARCHITECT) <br />Item <br />#7 <br />Add ventilation grilles in irrigation <br />204.00 <br />pump room. (ARCHITECT) <br />Item <br />#8 <br />Delete specified cash drawers. <br />( 708.00) <br />(CLERK/OWNER) <br />Item <br />#9 <br />Change specified door hardware to <br />2,862.00 <br />accommodate proper operation. (ARCHITECT) <br />Item <br />#10 <br />NOT USED <br />-0- <br />Item <br />#11 <br />Change irrigation heads to meet need of <br />1,775.00 <br />ground cover change. (ARCHITECT) <br />Item <br />#12 <br />Electric strike for door 2181 omitted <br />2,302.00 <br />from plans. (ARCHITECT) <br />Item <br />#13 <br />Provide A/C diffusers for Mechanical <br />450.00 <br />Rooms.. (ARCHITECT) <br />Item #14 Relocate equipment in Mechanical Rooms 1,527.00 <br />to provide easier access. (ARCHITECT) . <br />Item #15 Relocate thermostats from behind 500.00 <br />demountable furniture. (ARCHITECT) <br />Item #16 Relocate exit lights as per fire marshal. 420.00 <br />(ARCHITECT) <br />43 ft00K 94 PA r 25 <br />MARCH 28, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.