My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/28/1995
CBCC
>
Meetings
>
1990's
>
1995
>
3/28/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:21:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/28/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #24 Modify slab on grade to provide better 2,028.00 <br />drainage. (ARCHITECT) <br />Item #25 NOT USED -0- <br />Item #26 Connect fire pump to fire alarm system 371.00 <br />as per fire marshal. (ARCHITECT) <br />Item #27 Add thresholds and change lock functions 614.00 <br />on all elevator machine rooms. (ARCHITECT) <br />Item #28 Add floor stops to lobby front doors. 198.00 <br />(ARCHITECT) <br />Item #29 Modify wood window trim to accommodate 594.00 <br />lowered ceiling. (ARCHITECT) <br />Item #30 NOT USED -0- <br />Item #31 Extend telephone feeders in Room 2149. 2,328.00 <br />(ARCHITECT) <br />TOTAL $59,077.00 <br />New contract price is $10,210,828.02.. <br />RECOMMENDATIONS: <br />v <br />The Construction Manager and Staff, recommends approval of Change <br />Order Number 18 as submitted. <br />HTD/eh(COURCOI8.MAR) <br />APPROVED AGENDA ITEM <br />BY. i� s <br />James E. Chandler <br />County Administrator <br />FOR: 3- cJS <br />44 <br />MARCH 28, 1995 <br />_I <br />Boor <br />94 mu 72 <br />Page <br />two <br />INDIAN RIVER COURTHOUSE PROJECT <br />CHANGE ORDER NUMBER 18 _ <br />Item <br />#17 <br />Add tamper proof switches to fire pump. <br />1,134.00 <br />(ARCHITECT) <br />Item <br />#18 <br />Change function of several door locks <br />1,344.00 <br />to accommodate exiting in an emergency. <br />(ARCHITECT) <br />Item <br />#19 <br />Relocate exit lights as per fire marshal. <br />529.00 <br />(ARCHITECT) <br />Item <br />#20 <br />Remove deadbolts from main entrance doors <br />200.00 <br />as per fire marshal. (ARCHITECT) <br />Item <br />#21 <br />Additional street striping as requested <br />8,055.00 <br />by City. (ARCHITECT) <br />Item <br />#22 <br />Change lock function on door #2181 as per <br />66.00 <br />fire marshal. (ARCHITECT) <br />Item <br />#23 <br />Modify grand stairs hand rails to meet <br />5,636.00 <br />building code. (ARCHITECT) <br />Item #24 Modify slab on grade to provide better 2,028.00 <br />drainage. (ARCHITECT) <br />Item #25 NOT USED -0- <br />Item #26 Connect fire pump to fire alarm system 371.00 <br />as per fire marshal. (ARCHITECT) <br />Item #27 Add thresholds and change lock functions 614.00 <br />on all elevator machine rooms. (ARCHITECT) <br />Item #28 Add floor stops to lobby front doors. 198.00 <br />(ARCHITECT) <br />Item #29 Modify wood window trim to accommodate 594.00 <br />lowered ceiling. (ARCHITECT) <br />Item #30 NOT USED -0- <br />Item #31 Extend telephone feeders in Room 2149. 2,328.00 <br />(ARCHITECT) <br />TOTAL $59,077.00 <br />New contract price is $10,210,828.02.. <br />RECOMMENDATIONS: <br />v <br />The Construction Manager and Staff, recommends approval of Change <br />Order Number 18 as submitted. <br />HTD/eh(COURCOI8.MAR) <br />APPROVED AGENDA ITEM <br />BY. i� s <br />James E. Chandler <br />County Administrator <br />FOR: 3- cJS <br />44 <br />MARCH 28, 1995 <br />_I <br />
The URL can be used to link to this page
Your browser does not support the video tag.