530 13TM PLACE <br />ESTIMATED TIME FRAME FOR DESIGN, PERMITTING, AND RENOVATION <br />Address: 530 13th Place <br />Timeline for renovation/improvements required for permitting and inspections. <br />Within 30 days <br />1. Permitting of unpermitted installation of replacement doors and windows. Option; incorporate <br />this with the overall renovation permit, if so the 30 time criteria can be extended. <br />Within 90 days <br />1. Obtain a design professional to produce required plans and documents in ordertosubmit for <br />required renovation permit. <br />2. Duringthis same time period obtain a contractor that will submitforthe renovation permit. <br />Permit review period <br />1. Permit will be reviewed within 10days after submittal. <br />2. If there are review comments, have the contractorand design professional respond without <br />delay. <br />3. Ifa second review is required to address initialreview comments, thatwill be conducted upon <br />re -submittal. <br />4. Permit should be able to be issued between 10and 30 days after initial submittal <br />Start of construction within 45 days <br />1. Construction commence within 45days after permit issuance. <br />Construction/renovation completion 6 months <br />1. Construction should be able to be completed within 6 months afterthe start date. If continued <br />progress can be verified than time beyond the 6 months could be justified. <br />Total approximately 1 year <br />105 <br />