My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/18/2020 (4)
CBCC
>
Meetings
>
2020's
>
2020
>
02/18/2020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:25 PM
Creation date
7/10/2020 10:25:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/18/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
530 13TM PLACE <br />ESTIMATED TIME FRAME FOR DESIGN, PERMITTING, AND RENOVATION <br />Address: 530 13th Place <br />Timeline for renovation/improvements required for permitting and inspections. <br />Within 30 days <br />1. Permitting of unpermitted installation of replacement doors and windows. Option; incorporate <br />this with the overall renovation permit, if so the 30 time criteria can be extended. <br />Within 90 days <br />1. Obtain a design professional to produce required plans and documents in ordertosubmit for <br />required renovation permit. <br />2. Duringthis same time period obtain a contractor that will submitforthe renovation permit. <br />Permit review period <br />1. Permit will be reviewed within 10days after submittal. <br />2. If there are review comments, have the contractorand design professional respond without <br />delay. <br />3. Ifa second review is required to address initialreview comments, thatwill be conducted upon <br />re -submittal. <br />4. Permit should be able to be issued between 10and 30 days after initial submittal <br />Start of construction within 45 days <br />1. Construction commence within 45days after permit issuance. <br />Construction/renovation completion 6 months <br />1. Construction should be able to be completed within 6 months afterthe start date. If continued <br />progress can be verified than time beyond the 6 months could be justified. <br />Total approximately 1 year <br />105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.