My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/18/2020 (4)
CBCC
>
Meetings
>
2020's
>
2020
>
02/18/2020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:25 PM
Creation date
7/10/2020 10:25:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/18/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C <br />ea <br />WATER MAINS AND FORCEMAIN PLANS <br />REMARKS <br />Alignment for 16 -inch Water Main and 12 -inch Force Main including <br />interconnections, valves, fittings, etc. along CR -510 <br />3 water crossings (Lateral Canal C, L, and S Prong Slough ) <br />3 water bodies (Lateral Canal C, L, and S Prong Slough ) <br />Estimate is for 2 field visits x 2 persons @ 8 hours each and includes <br />preparation, travel, and documentation time. First review will be <br />conducted after 60% plans to verify proposed location. Second at Final <br />UWHC plans to ensure constructability and connection points. <br />Assume there are 4 utilities within the project limits <br />Setup project, maintenance of files, schedule updates, sub -consultant <br />management, progress reports etc. <br />As required by FDOT. <br />Trans*port development and update of quantities for water main and <br />coordination with FDOT-D4 Design Section. <br />Includes preparation of engineers estimate of probable construction <br />cost in FDOT formats and revisions as necessary <br />Construction phasing of the WM, FM & Reuse WM and associated <br />laterals. <br />a <br />M <br />Review Geotech information provided by FDOT for installing water <br />main, check for contamination and detemline if special fittings or wrap <br />are required for water mains <br />Assume 2 persons x 8 hours x 1 trip (includes prep & travel). This trip is <br />,for mandatory field phase review meetings as per FDOT prior to project <br />completion. One meeting at PS&E. <br />CADD <br />HOURS <br />O <br />' <br />N <br />N <br />TOTAL <br />HOURS <br />CO <br />120 <br />0 <br />M <br />O <br />() CD <br />N <br />N <br />V <br />C'�Y <br />W <br />O <br />cF <br />VI <br />WCD <br />R <br />14 <br />513 <br />NO. OF <br />SHEETS <br />SUBACTIVITY SUBTOTAL <br />SUBACTIVITY TOTAL <br />`n F <br />O <br />S <br />120 <br />N <br />ch <br />(O <br />O <br />0 <br />N <br />N <br />O <br />N <br />C7 <br />M <br />CO <br />O <br />ct <br />O <br />NO. OF <br />UNITS <br />M <br />N <br />1- <br />e- <br />e- <br />r <br />N- <br />.- <br />O <br />a <br />o <br />ch <br />BASIS <br />OF <br />ESTIMATE <br />LS <br />LS <br />CO <br />W <br />LS <br />W <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS 1 <br />CO <br />o0 <br />W <br />Y <br />en <br />E <br />F <br />Pipe Line Alignment & Design <br />Structural Analysis <br />Water Way Crossing <br />Field Reviews <br />Field Survey & Service Location <br />1Transfer Existing Utilities to Plan/Profile_ <br />Contract File (Set-up and maintenance) <br />Quantities & Tabulation <br />C.E.S. Summary of Pay Items <br />,Engineer's Opinion of Probable Cost of Construction <br />Construction Phasing Analysis <br />Wining & Marking Analysis <br />Geotech Investigation (Including Contamination) <br />Quality Assurance/Quality Control <br />Attend compulsory FDOT Field Review Meeting(s) <br />N <br />CO <br />C' <br />to <br />(O <br />I� <br />co <br />co <br />n- <br />(CD <br />
The URL can be used to link to this page
Your browser does not support the video tag.