My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/18/2020 (4)
CBCC
>
Meetings
>
2020's
>
2020
>
02/18/2020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:25 PM
Creation date
7/10/2020 10:25:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/18/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT D <br />ACTIVITY: A. (WATER_MAINS ANDFORCEMAIN PLANS) <br />REMARKS <br />Alignment for 16 -inch WM, 12 -inch FM & 12 -inch Reuse WM including <br />interconnections, valves, fittings, etc. along CR -510 <br />1 water crossing (Lateral Canal G) <br />1 water crossin• Lateral Canal G <br />Estimate is for 2 field visits x 2 persons @ 8 hours each and includes <br />preparation, travel, and documentation time. First review will be <br />conducted after 60% plans to verify proposed location. Second at Final <br />UWHC plans to ensure constructability and connection points. <br />!Assume there are 4 utilities within the project limits <br />Setup project, maintenance of files, schedule updates, sub -consultant <br />management, progress reports etc. <br />As required by FDOT. <br />Trans*port development and update of quantities for water main and <br />coordination with FDOT-D4 Design Section. <br />Includes preparation of engineers estimate of probable construction <br />cost in FDOT formats and revisions as necessary <br />Construction phasing of the WM, FM & Reuse WM and associated <br />laterals. <br />Z <br />Review Geotech information provided by FDOT for installing water <br />main, check for contamination and determine if special fittings or wrap <br />are required for water mains <br />Assume 2 persons x 8 hours x 1 trip (includes prep & travel). This trip is <br />for mandatory field phase review meetings as per FDOT prior to project <br />completion. One meeting at PS&E. <br />C y <br />c <br />U G <br />TOTAL <br />HOURS <br />64 <br />O <br />CO <br />N <br />M <br />Cl <br />M <br />O <br />30 <br />N <br />N <br />20 <br />44 <br />M <br />M <br />CO <br />O <br />cr <br />359 <br />r <br />CO <br />CONY <br />CO <br />M <br />NO. OF <br />SHEETS <br />• <br />SUBACTIVITY SUBTOTAL <br />SUBACTIVITY TOTAL <br />HOURS/ <br />UNIT <br />tO0 <br />32 <br />CD <br />O <br />n <br />N <br />20 <br />M <br />CO <br />O <br />.CrCO <br />NO. OF <br />UNITS <br />N <br />.- <br />V' <br />,- <br />,- <br />,- <br />,- <br />O <br />•- <br />3% <br />e - <br />BASIS <br />OF <br />ESTIMATE <br />LS <br />LS <br />LS <br />W <br />LS <br />1 EA 1 <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />J <br />W <br />F <br />Pipe Line Alignment & Design <br />Structural Analysis <br />[Water Way Crossing <br />Field Reviews <br />(Field Survey & Service Location <br />!Transfer Existing_Utilities to Plan/Profile <br />Contract File (Set-up and maintenance) <br />Quantities & Tabulation <br />C.E.S. Summary of Pay Items <br />Engineer's Opinion of Probable Cost of Construction <br />Construction Phasing Analysis <br />!Signing & Marking Analysis <br />Geotech Investigation (Including Contamination) <br />Quality Assurance/Quality Control <br />Attend compulsory FDOT Field Review Meeting(s) <br />r <br />N <br />01 <br />Cr <br />U <br />CO <br />1.— <br />a0 <br />Q) <br />.- <br />,- <br />V <br />CO <br />
The URL can be used to link to this page
Your browser does not support the video tag.