My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/18/2020 (4)
CBCC
>
Meetings
>
2020's
>
2020
>
02/18/2020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:25 PM
Creation date
7/10/2020 10:25:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/18/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENTA <br />SUBACTIVITY: 2 (Final Plans) <br />ACTIVITY: A. (WATER MAINS AND FORCEMAIN PLANS) <br />REMARKS <br />Develop standard FDOT cover sheet for UWHC projects (3 lines) <br />Development of project specific general notes, Department of Health <br />and FDOT D4 <br />Key map of all plan sheets and legends all symbols used (3 lines) <br />Tabulation of quantities using FDOT basis of estimate <br />a <br />z <br />Establish station and off set for all new meters, meters to be removed II <br />land length of service lines <br />(This includes allwork to create elements showing the mainline <br />alignment for both horizontal and vertical geometries in plan and profile <br />portion of 40' scale plan sheets for proposed 16" WM, 12" FM, 12" <br />Reuse WM and existing utilities per FDOT standards. <br />(NOT USED �I <br />This includes all work to create elements showing the side street <br />alignment for both horizontal and vertical geometries in plan and profile <br />portion of plan sheets for proposed water mains (2) and existing utilities <br />per FDOT standards <br />N/A (no water crossings) II <br />Not required due to new roadway proposed II <br />Pipe laying sequence for construction of the 16 -inch WM and 12 -inch <br />FM & interconnection to existing mains and associated laterals. Also, <br />for the new 12" Reuse WM. <br />Includes Typical section with phasing notes pertaining to the proposed <br />utilities for each phase <br />A m <br />G a <br />d <br />U O <br />2 <br />TOTAL <br />HOURS <br />CV <br />O <br />(D <br />18 <br />OCV <br />O <br />O <br />(D <br />O <br />N <br />O <br />CO <br />N <br />CO <br />N <br />O <br />O <br />N <br />N <br />NO. OF <br />SHEETS <br />HOURS/ <br />UNIT <br />( O <br />O <br />O <br />O <br />�' <br />O <br />CD <br />36 l <br />O <br />14 <br />14 <br />O <br />O <br />N <br />NO. OF <br />UNITS <br />r <br />r <br />..-. <br />CD <br />O <br />N <br />O..- <br />O <br />(+) <br />N <br />O <br />N <br />N <br />O <br />O <br />A- <br />BASIS <br />OF <br />ESTIMATE <br />Sheet <br />L <br />CD <br />0 <br />L <br />CD <br />Sheet <br />0 <br />L <br />GD <br />Sheet <br />0 <br />L <br />CO <br />0 <br />L <br />CO <br />Sheet <br />I <br />L <br />CO <br />0 <br />L <br />CO <br />Sheet <br />Sheet <br />Sheet <br />Sheet <br />Sheet <br />Sheet <br />cAQ <br />F <br />Key Sheet/Key Plan <br />General Notes <br />Legend and Key Plan <br />Tabulation of Quantities and Pay Item Notes <br />Summary of Valve and Manhole adjustment <br />Summary of water meter service and service lines <br />Combination 16" WM, 12" FM, 12" Reuse WM Plan/Profile <br />Sheets <br />(NOT USED <br />• <br />Laterals Connections Plan/Profile Sheets <br />Fire Hydrant Connection Plan/Profile Sheets <br />Structural Details <br />General Details <br />Typical Details <br />Pavement and Base Restoration/General Notes and Details <br />Core Boring Reports <br />Phasing Notes <br />Phasing Typical Sections <br />N <br />(") <br />R <br />([) <br />O <br />CO <br />03 <br />.- <br />‘--,- <br />07 <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.