ATTACHMENT A <br />SUBACTIV <br />WATER MAINS AND FORCEMAIN PLANS <br />REMARKS <br />Alignment for 16 -inch WM, 12 -inch FM & 12 -inch Reuse WM including <br />interconnections, valves, fittings, etc. along CR -510 <br />N/A (no water crossings) <br />a <br />z <br />Estimate is for 2 field visits x 2 persons @ 8 hours each and includes <br />preparation, travel, and documentation time. First review will be <br />conducted after 60% plans to verify proposed location. Second at Final <br />JPA plans to ensure constructability and connection points. <br />Assume there are 5 utilities within the project limits 0 <br />Setup project, maintenance of files, schedule updates, sub -consultant <br />management, progress reports etc. <br />As required by FDOT. <br />Trans*port development and update of quantities for water main and <br />coordination with FDOT-D4 Design Section. <br />Includes preparation of engineers estimate of probable construction <br />cost in FDOT formats and revisions as necessary <br />Construction phasing of the water & force mains and associated <br />laterals. <br />a <br />z <br />Review Geotech information provided by FDOT for installing water <br />main, check for contamination and determine if special fittings or wrap <br />are required for water main <br />Assume 2 persons x 8 hours x 1 trip (includes prep & travel). This trip is <br />for mandatory field phase review meetings as per FDOT prior to project <br />completion. One meeting at PS&E. <br />CADD <br />HOURS <br />TOTAL <br />HOURS <br />O <br />O <br />M <br />O <br />1� <br />M <br />N <br />N <br />M <br />CO <br />O <br />V' <br />in <br />A <br />N <br />CO <br />CCD <br />299 <br />NO. OF <br />SHEETS <br />SUBACTIVITY SUBTOTAL <br />SUBACTIVITY TOTAL <br />HOURS/ <br />UNIT <br />O <br />OCD <br />ON <br />LO <br />20 <br />33 <br />_ <br />O <br />'V' <br />CO <br />NO. OF <br />UNITS <br />a- <br />O <br />O <br />N <br />'- <br />a- <br />a- <br />a- <br />.- <br />O <br />a- <br />o <br />M <br />BASIS <br />OF <br />ESTIMATE <br />LS <br />LS <br />LS <br />W <br />LS <br />EA <br />11 LS <br />LS <br />LS <br />J J <br />LS <br />LS <br />W <br />e <br />x <br />c <br />F <br />Pipe Line Alignment & Design <br />Structural Analysis <br />Water Way Crossing <br />Field Reviews <br />Field Survey & Service Location <br />Transfer Existing Utilities to Plan/Profile <br />Contract File (Set-up and maintenance) <br />Quantities & Tabulation <br />C.E.S. Summary of Pay Items <br />Engineers Opinion of Probable Cost of Construction <br />Construction Phasing Analysis <br />Signing & Marking Analysis <br />Geotech Investigation (Including Contamination) <br />Quality Assurance/Quality Control <br />Attend compulsory FDOT Field Review Meeting(s) <br />N <br />M <br />V <br />ul <br />co <br />I� <br />co <br />Q) <br />O <br />a- <br />a <br />