Laserfiche WebLink
CARTER ASSOCIATES, INC. <br />JANUARY 2020 <br />FEE SCHEDULE <br />Staff Type: Hourly Rates <br />Engineer (Principal) $165.00 <br />Engineer I $140.00 <br />Engineer II $125.00 <br />Engineer III $115.00 <br />Engineer IV $105.00 <br />Engineer V $ 95.00 <br />Surveyor (Principal) $165.00 <br />Surveyor (Sr. Consultant) $140.00 <br />Surveyor I $140.00 <br />Surveyor II $125.00 <br />Surveyor III $105.00 <br />CAD/GIS Tech I $115.00 <br />CAD/GIS Tech II $110.00 <br />CAD/GIS Tech III $105.00 <br />CAD/GIS Tech IV $ 95.00 <br />CAD/GIS Tech V. $ 85.00 <br />Administrative Staff $ 60.00 <br />Expert Witness $300.00 <br />4 Man Survey Crew $175.00 <br />3 -Man Survey Crew $150.00 <br />2 -Man Survey Crew $135.00 <br />1 -Man Survey Crew $110.00 <br />Inspector $ 65.00 <br />SPECIALIZED EQUIPMENT: <br />Leica HD P40 Scanner $175.00/Hour <br />Aluminum Boat $500.00/Day <br />All -Terrain Vehicle (ATV)/Trailer $250.00/Day <br />$1,000.00/Week <br />REIMBURSABLE EXPENSES: <br />Postage, Express Mail, etc. • Cost <br />Blueprints/Blackline (24" x 36") $2.00/Each <br />Color Prints (24"x36) $5 .00/Each <br />Mileage IRS Standard Rate <br />Mylar $7.00/Each <br />Photocopies: <br />8.5" x 11" 150/Each <br />8.5" x 14" 250/Each <br />11" x 17" 350/Each <br />Concrete Monuments $20.00/Each <br />Rebar $ 2.50/Each <br />Laths $ 0.75/Each <br />Hubs $ 1.00/Each <br />Sub -Consultants <br />Cost + 10% <br />Note: These hourly billing rates will remain effective for the duration of this Agreement <br />30 <br />