Laserfiche WebLink
Page 1 of 4 <br />Board of County Commissioners <br />1801 27th Street <br />A y Vero Beach, Florida 32360-3365 <br />Telephone: (772) 567-8000 <br />'�LoRi�P Fax: (772) 778-9391 <br />1110H IMT114 a I ILI 10 ►l <br />58TH AVENUE (FROM NORTH OF 57TH STREET TO 85TH STREET) <br />FULL DEPTH RECLAMATION <br />PROJECT IRC -1325 FDOT FM No. 436416-1-54-01 <br />February 19, 2020 at 10:00 AM <br />Conference Room Al -303 <br />The following meeting notes set forth our understanding of the discussions and decisions made at the subject <br />meeting. If no objections, questions, additions, or comments are received within five (5) working days from <br />issuance of the meeting notes, we will assume that our understandings are correct. The project will move <br />forward according to the bid plans and specifications and the understandings herein. <br />PROJECT NAME: 581h Avenue (From North of 57th Street to 851h Street) Full Depth Reclamation <br />PROJECT NUMBER: IRC -1325 <br />BID NUMBER: 2020021 <br />FM NUMBER: 436416-1-54-01 <br />INTRODUCTIONS/SIGN IN SHEET <br />The meeting was called to order by Robert Skok. See attached sign in sheets for a list of the <br />attPrI&Ps_ <br />PROJECT DESCRIPTION: The proposed improvements to 58th Avenue from north of 57th Street to 85th <br />Street and 69th Street from Sta 11+84 to Sta 30+47 consist of reconstructing the roadway utilizing <br />full depth reclamation, milling and resurfacing, widening the existing shoulders to 5 -feet, structural <br />asphalt, surface asphalt, drainage improvements, waterline directional bore, utility adjustments, <br />signing, and pavement markings. This project is an F.D.O.T. Small County Outreach Program (SCOP) <br />funded project, FM No. 436416-1-54-01. <br />CONTRACT DETAILS <br />Bid Opening: Wednesday, March 11, 2020 at 2:00 PM <br />Contract Time: 365 days to substantial completion <br />395 days to final completion <br />Liquidated Damages: $3,447.00 per day <br />P:APublic Works\ENGINEERING DIVISION PROJECTS\1325 58th Avenue (57th St to CR 510) Roadway inventory\1- <br />Admin\Meetin-,s\PreBid\1325_Pre-Bicl Meeting Minutes20200219.doc <br />