My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-113G
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-113G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 10:10:25 AM
Creation date
7/20/2020 2:12:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/09/2020
Control Number
2020-113G
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract Documents and Specifications
Area
58th Avenue, North of 57th Street to 85th Street
Project Number
IRC-1325
Bid Number
2020021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 4 <br />• As requested by a Contractor, the County will provide first generation copies of either the <br />plans or Cadd files. <br />• Pay Item Number 711-11-141 has a corrected quantity is 0.49 GM and Pay Item Number <br />711-11-241 has a corrected quantity is 0.08 GM. These two corrections will be part of an <br />addendum. <br />• The revised bid schedule will be provided in Excel. <br />• This project is FDOT Off -System. <br />• There are three golf courses within the project limits and the Contractor will need to <br />coordinate work scheduling with each of the golf courses and provide access at all times. <br />• The governing design standards are, "Florida Department of Transportation, FY2017-18 <br />Design Standards". The governing standard specifications are, "Florida Department of <br />Transportation, Jan. 2017 Standard Specifications for Road and Bridge Construction". This is <br />also noted on the Key Sheet number 1 of the contract plans. <br />• FDOT will need to provide concurrence to the County before an award is made. <br />• A qualified drill shaft inspector will be required. It was determined after the meeting that <br />mast arms are not in the project scope but concrete strain poles and span wires are in the <br />project scope. <br />• The addendums will be issued as soon as possible. <br />ATTACHED: Sign in sheet <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1325 58th Avenue (57th St to CR 510) Roadway Inventory\1- <br />Admin\Meetings\Pre13id\I325_Pre-Bid Meeting Mintttes_20200219.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.