Laserfiche WebLink
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 01 25 00-2 Substitution Procedures <br />6. Contractor’s certification that proposed substitution complies with requirements in <br />the contract documents and is appropriate for applications indicated. <br />7. Contractor’s waiver of rights to additional payment or time that may subsequently <br />become necessary because of failure of proposed substitution to produce <br />indicated results. <br />8. If requesting product substitution after bid award, Contractor shall provide cost <br />information including proposal of change, if any, in the contract sum. <br /> PRODUCTS (NOT USED) <br /> EXECUTION (NOT USED) <br />END OF SECTION 01 25 00