Laserfiche WebLink
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 01 31 00-2 Project Management and Coordination <br />1.03 PROJECT MEETINGS <br />A. Substantial Completion Inspection Meeting <br />1. Scheduled by Owner and Engineer upon written notification of substantial com- <br />pletion of work from the Contractor. <br />2. Attendance: Owner, Engineer, Contractor, material manufacturer. <br />3. Minimum Agenda: Walkover inspection; verification of substantial completion; <br />identification of punch list items; identification of problems, which may impede is- <br />suance of warranties. <br />4. Refer to Section 01 77 00 for other requirements. <br />B. Final Inspection Meeting <br />1. Scheduled by Owner and Engineer upon written notification of final completion of <br />work from the Contractor. <br />2. Attendance: Owner, Engineer, Contractor. <br />3. Minimum Agenda: Verification of final completion including the completion of the <br />punch list items. <br />4. Refer to Section 01 77 00 for other requirements. <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION (NOT USED) <br />END OF SECTION 01 31 00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />