Laserfiche WebLink
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 01 33 00-2 Submittal Procedures <br />a. Copy of all warranties to meet the requirements of their respective <br />specification section. <br />4. Steel Deck Repair/Securement (Section 05 31 23) <br />5. Rough Carpentry (Section 06 10 00) <br />6. Preparation for Reroofing (Section 07 01 50) <br />7. Modified Bitumen Roofing (Section 07 52 16) <br />8. Sheet Metal Flashing and Trim (Section 07 62 00) <br />9. Manufactured Gravel Stops and Fascias (Section 07 71 19) <br />10. Roof Accessories (Section 07 72 00) <br />11. Storm Drainage (Section 22 14 00) <br />12. Shop drawings or letter stating that the contractor will install materials as detailed <br />in the Contract Drawings unless properly authorized by the Engineer. <br />13. Existing damaged/dysfunctional components documentation (videotape, photos, <br />etc.) including but not limited to; asphalt spills, windows, walls, sidewalks, paving, <br />ceilings, etc. Lack of submission prior to commencement of work indicates <br />Contractor has discovered no existing damaged components and takes <br />responsibility for any damages caused by operations. <br />14. Complete list of materials with Safety Data Sheets (SDS) <br />PART 2 PRODUCTS <br />2.01 SUBMITTALS <br />A. General: Prepare and submit Submittals required herein and by individual Specification <br />Sections. <br />B. Product Data: Collect information into a single submittal for each element of construction <br />and type of product or equipment. <br />1. If information must be specially prepared for submittal because standard printed <br />data are not suitable for use, submit as Shop Drawings, not as Product Data. <br />2. Mark each copy of each submittal to show which products and options are <br />applicable. <br />3. Include the following information, as applicable: <br />a. Manufacturer's written recommendations. <br />b. Manufacturer's product specifications. <br />c. Manufacturer's installation instructions. <br />d. Manufacturer's catalog cuts. <br />e. Printed performance curves. <br />f. Operational range diagrams. <br />g. Compliance with recognized trade association standards. <br />h. Compliance with recognized testing agency standards. <br />C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not <br />base Shop Drawings on reproductions of the Contract Documents or other printed data. <br />1. Preparation: Include the following information, as applicable: <br />a. Dimensions. <br />b. Identification of products. <br />c. Fabrication and installation drawings. <br />d. Roughing-in and setting diagrams. <br />e. Shopwork manufacturing instructions. <br />f. Templates and patterns. <br />g. Schedules. <br />h. Notation of coordination requirements.