My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116D-2
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116D-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 3:31:29 PM
Creation date
7/28/2020 3:30:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
06/23/2020
Control Number
2020-116D-1
Agenda Item Number
8.N.
Entity Name
Atlantic Roofing
Main Library
Subject
Replacement Roof
Project Number
IRC-1838
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 01 73 29-3 Cutting and Patching <br />cover openings when not in use. <br />2. Existing Finished Surfaces: Cut or drill from the exposed or finished side into <br />concealed surfaces. <br />3. Concrete or Masonry: Cut using a cutting machine, such as an abrasive saw or <br />a diamond-core drill. <br />4. Proceed with patching after construction operations requiring cutting are com- <br />plete. <br />C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar op- <br />erations following performance of other Work. Patch with durable seams that are as in- <br />visible as possible. Provide materials and comply with installation requirements specified <br />in other Sections of these Specifications. <br />1. Inspection: Where feasible, test and inspect patched areas after completion to <br />demonstrate integrity of installation. <br />2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish <br />restoration into retained adjoining construction in a manner that will eliminate ev- <br />idence of patching and refinishing. <br />3. Floors and Walls: Where walls or partitions that are removed extend from one fin- <br />ished area into another, patch and repair floor and wall surfaces in the new <br />space. Provide an even surface of uniform finish, color, texture, and appearance. <br />Remove existing floor and wall coverings and replace with new materials, if nec- <br />essary, to achieve uniform color and appearance. <br />a. Where patching occurs in a painted surface, apply primer and intermedi- <br />ate paint coats over the patch and apply final paint coat over entire un- <br />broken surface containing the patch. Provide additional coats until patch <br />blends with adjacent surfaces. <br />4. Exterior Building Enclosure: Patch components in a manner that restores enclo- <br />sure to a weather tight condition. <br />5. Ceilings: Patch, repair, or re-hang existing ceilings as necessary to provide an <br />even-plane surface of uniform appearance. <br />D. Cleaning: Clean areas and spaces where cutting and patching are performed. Complete- <br />ly remove paint, mortar, oils, putty and similar materials. <br />END OF SECTION 01 73 29
The URL can be used to link to this page
Your browser does not support the video tag.