My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116D-2
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116D-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 3:31:29 PM
Creation date
7/28/2020 3:30:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
06/23/2020
Control Number
2020-116D-1
Agenda Item Number
8.N.
Entity Name
Atlantic Roofing
Main Library
Subject
Replacement Roof
Project Number
IRC-1838
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 01 77 00-1 Closeout Procedures <br />SECTION 01 77 00 <br />CLOSEOUT PROCEDURES <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. This Section includes administrative and procedural requirements for contract closeout, <br />including, but not limited to, the following: <br />1. Warranties. <br />1.02 WARRANTIES <br />A. Modified Bitumen Roofing System warranty as outlined in Section 07 52 16. <br />B. Sheet Metal Finish warranty as outlined in Section 07 62 00. <br />C. Manufactured Gravel Stops and Fascias warranty as outlined in Section 07 71 19. <br />D. Contractor’s five (5) year warranty on their company letterhead using sample contained in <br />the Project Manual. <br />1. Contractor will be required to attend two post construction field inspections: the <br />first no earlier than twenty -three (23) months and no later than twenty-four (24) <br />months after the date of Final Completion and the second no earlier than fifty- <br />nine (59) months and no later than sixty (60) months. Contractor shall complete <br />any corrective action requested by Owner, Engineer, or Manufacturer at no addi- <br />tional cost to the Owner. <br />E. Contractor’s Asbestos-Free Warranty on their company letterhead using sample con- <br />tained in the Project Manual. <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION (NOT USED) <br />END OF SECTION 01 77 00
The URL can be used to link to this page
Your browser does not support the video tag.