Laserfiche WebLink
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 01 77 00-1 Closeout Procedures <br />SECTION 01 77 00 <br />CLOSEOUT PROCEDURES <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. This Section includes administrative and procedural requirements for contract closeout, <br />including, but not limited to, the following: <br />1. Warranties. <br />1.02 WARRANTIES <br />A. Modified Bitumen Roofing System warranty as outlined in Section 07 52 16. <br />B. Sheet Metal Finish warranty as outlined in Section 07 62 00. <br />C. Manufactured Gravel Stops and Fascias warranty as outlined in Section 07 71 19. <br />D. Contractor’s five (5) year warranty on their company letterhead using sample contained in <br />the Project Manual. <br />1. Contractor will be required to attend two post construction field inspections: the <br />first no earlier than twenty -three (23) months and no later than twenty-four (24) <br />months after the date of Final Completion and the second no earlier than fifty- <br />nine (59) months and no later than sixty (60) months. Contractor shall complete <br />any corrective action requested by Owner, Engineer, or Manufacturer at no addi- <br />tional cost to the Owner. <br />E. Contractor’s Asbestos-Free Warranty on their company letterhead using sample con- <br />tained in the Project Manual. <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION (NOT USED) <br />END OF SECTION 01 77 00