My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-116D-2
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-116D-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 3:31:29 PM
Creation date
7/28/2020 3:30:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Manual
Approved Date
06/23/2020
Control Number
2020-116D-1
Agenda Item Number
8.N.
Entity Name
Atlantic Roofing
Main Library
Subject
Replacement Roof
Project Number
IRC-1838
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC-1838 Indian River County <br />Main Library <br />Roof Replacement 07 72 00-2 Roof Accessories <br />not acceptable) and designated for “one-way” venting with a minimum venting volume of <br />42 cfm: <br />1. Marathon MC Vent <br />2. Engineers approved equivalent <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A. Verification of Conditions: Examine subsurfaces to receive Work and report detrimental <br />conditions in writing to Architect. Commencement of Work will be construed as ac- <br />ceptance of subsurfaces. <br />B. Coordination: Coordinate with other Work which affects, connects with, or will be con- <br />cealed by this Work <br />3.2 INSTALLATION <br />A. Venting <br />1. Provide for interior venting; install one-way moisture relief vents at an approxi- <br />mate rate of one vent per 1500 square feet of roof area. <br />2. Locate vent locations symmetrically by chalk line. Refer to Contract Drawing for <br />one-way vent layout. <br />3. Core 6” dia. hole in LWIC system down to but do not damage temporary mem- <br />brane. <br />4. Fill void in LWIC with fiberglass batt insulation. <br />5. Refer to Section 07 52 16-Modified Bitumen Roofing for specific flashing re- <br />quirements: <br />a. Prime both sides of metal flange and set in bed of roof cement. <br />b. Strip-in flange to base ply with stripping ply and cold adhesive. Stripping <br />ply shall extend a minimum of 4” onto base ply and fit closely to lip of <br />vertical sleeve. <br />c. Install elastomeric sealant in void between surface ply and base of <br />sleeve. <br />6. Install elastomeric sealant in void between surface ply and base of sleeve. <br />3.3 CLEANING <br />A. During the course of the Work and on completion, remove and dispose of excess materi- <br />als, equipment and debris away from premises. <br />END OF SECTION 07 72 00
The URL can be used to link to this page
Your browser does not support the video tag.