Laserfiche WebLink
IRC BID #2020039 Unit Item Cost Sheet <br />Indian River County Department of Utility Services 2020 Labor Contract <br />SCHEDULE"A" <br />Company Name: Hinterland Group Inc. <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price (Furnish) <br />Unit Price to <br />Install <br />Total Unit Price <br />(Furnish + Installation) <br />SECTION C - High Density Polyethylene <br />Piping & Horizontal Directional Boring <br />Cl <br />High Density Polyethylene Pipe (HDPE) -Trench <br />(a) 2 -inch <br />1 <br />L.F. <br />$ <br />3.00 <br />$ <br />12.00 <br />$ <br />15.00 <br />(b) 4 -inch <br />1 <br />L.F. <br />$ <br />6.00 <br />$ <br />14.00 <br />$ <br />20.00 <br />(c) 6 -inch <br />1 <br />L.F. <br />$ <br />10.00 <br />$ <br />16.00 <br />$ <br />26.00 <br />(d) 8 -inch <br />1 <br />L.F. <br />$ <br />18.00 <br />$ <br />18.00 <br />$ <br />36.00 <br />(e) 12 inch <br />1 <br />L.F. <br />$ <br />32.00 <br />$ <br />20.00 <br />$ <br />52.00 <br />(f) 16 -inch <br />1 <br />L.F. <br />$ <br />60.00 <br />$ <br />24.00 <br />$ <br />84.00 <br />(g) 18 -inch <br />1 <br />L.F. <br />$ <br />70.00 <br />$ <br />30.00 <br />$ <br />100.00 <br />(h) 20 -inch <br />1 <br />L.F. <br />$ <br />85.00 <br />$ <br />40.00 <br />$ <br />125.00 <br />EC2 <br />(i) 24 -inch <br />1 <br />L.F. <br />$ <br />110.00 <br />$ <br />50.00 <br />$ <br />160.00 <br />Horizontal Directional Boring (HDPE) -HDD <br />(b) 4 -inch <br />1 <br />L.F. <br />$ <br />22.00 <br />$ <br />12.00 <br />$ <br />34.00 <br />(c) 6 -inch <br />1 <br />L.F. <br />$ <br />28.00 <br />$ <br />14.00 <br />$ <br />42.00 <br />(d) 8 -inch <br />1 <br />L.F. <br />$ <br />34.00 <br />$ <br />16.00 <br />$ <br />50.00 <br />(e) 12 inch <br />1 <br />L.F. <br />$ <br />64.00 <br />$ <br />20.00 <br />$ <br />84.00 <br />(f) 16 -inch <br />1 <br />L.F. <br />$ <br />82.00 <br />$ <br />25.00 <br />$ <br />107.00 <br />(g) 18 -inch <br />1 <br />L.F. <br />$ <br />100.00 <br />$ <br />30.00 <br />$ <br />130.00 <br />(h) 20 -inch <br />1 <br />L.F. <br />$ <br />125.00 <br />$ <br />40.00 <br />$ <br />165.00 <br />(i) 24 -inch <br />1 <br />L.F. <br />$ <br />160.00 <br />$ <br />50.00 <br />$ <br />210.00 <br />C3 <br />Horizontally Directional Drilled -PVC Driveway Bores <br />20 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />2,500.00 <br />$ <br />500.00 <br />$ <br />3,000.00 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />3,500.00 <br />$ <br />500.00 <br />$ <br />4,000.00 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />4,500.00 <br />$ <br />500.00 <br />$ <br />5,000.00 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />5,000.00 <br />$ <br />500.00 <br />$ <br />5,500.00 <br />40 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />3,500.00 <br />$ <br />500.00 <br />$ <br />4,000.00 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />4,500.00 <br />$ <br />500.00 <br />$ <br />5,000.00 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />5,000.00 <br />$ <br />500.00 <br />$ <br />5,500.00 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />5,500.00 <br />$ <br />500.00 <br />$ <br />6,000.00 <br />60 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />4,000.00 <br />$ <br />750.00 <br />$ <br />4,750.00 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />5,000.00 <br />$ <br />750.00 <br />$ <br />5,750.00 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />5,500.00 <br />$ <br />750.00 <br />$ <br />6,250.00 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />6,000.00 <br />$ <br />750.00 <br />$ <br />6,750.00 <br />11 of 13 <br />