My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-124B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-124B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 3:19:10 PM
Creation date
8/3/2020 3:20:50 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/07/2020
Control Number
2020-124B
Agenda Item Number
8.M.
Entity Name
Hinterland Group, Inc.
Subject
2020 Agreement Utility Services; construction/repair water services RFP 2020039
Bid Number
2020039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC BID #12020039 Unit Item Cost Sheet <br />Indian River County Department of Utility Services 2020 Labor Contract <br />SCHEDULE "A" <br />Company Name: Hinterland Group Inc. <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price (Furnish) <br />Unit Price to <br />Install <br />Total Unit Price <br />(Furnish + Installation) <br />SECTION D: Time and Materials Rates (TO BE USED ON T&M ORDERS ONLY) <br />D1 <br />Equipment Hourly Rates <br />(a) <br />Trackhoe (specify model) <br />(medium) <br />1 <br />Hr. <br />NA <br />$ <br />75.00 <br />$ <br />75.00 <br />(large) <br />1 <br />Hr. <br />NA <br />$ <br />125.00 <br />$ <br />125.00 <br />(b) <br />Combination Backhoe <br />1 <br />Hr. <br />NA <br />$ <br />65.00 <br />$ <br />65.00 <br />(c) <br />Front end Loader <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />85.00 <br />(d) <br />Grader <br />1 <br />Hr. <br />NA <br />$ <br />120.00 <br />$ <br />120.00 <br />(e) <br />Dump Truck ( 9 C.Y.) <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />85.00 <br />(f) <br />Tandem Dump Truck (18 C.Y.) <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />85.00 <br />(g) <br />Forklift <br />1 <br />Hr. <br />NA <br />$ <br />50.00 <br />$ <br />50.00 <br />(h) <br />Crew Truck with hand tools <br />1 <br />Hr. <br />NA <br />$ <br />25.00 <br />$ <br />25.00 <br />(i) <br />ITrash Pump 3" <br />1 <br />Hr. <br />NA <br />$ <br />15.00 <br />$ <br />15.00 <br />(j) <br />ITrash Pump 2" <br />1 <br />Hr. <br />NA <br />$ <br />10.00 <br />$ <br />10.00 <br />(k) <br />Walk behind Vibrating Roller <br />1 <br />Hr. <br />NA <br />$ <br />20.00 <br />$ <br />20.00 <br />(1) <br />Rev. Plate Compactor <br />1 <br />Hr. <br />NA <br />$ <br />30.00 <br />$ <br />30.00 <br />(m) Jumping Jack <br />1 <br />Hr. <br />NA <br />$ <br />10.00 <br />$ <br />10.00 <br />(n) <br />Cut off saw (14") <br />1 <br />Hr. <br />NA <br />$ <br />5.00 <br />$ <br />5.00 <br />(o) <br />Street saw (14") <br />1 <br />Hr. <br />NA <br />$ <br />5.00 <br />$ <br />5.00 <br />(p) <br />lGradall <br />1 <br />Hr. <br />NA <br />$ <br />120.00 <br />$ <br />120.00 <br />(q) <br />I Roller <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />85.00 <br />(r) <br />Welding Truck <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />85.00 <br />(s) <br />Welder <br />1 <br />Hr. <br />NA <br />$ <br />85.00 <br />$ <br />85.00 <br />(t) <br />Cement Mixer <br />1 <br />Hr. <br />NA <br />$ <br />15.00 <br />$ <br />15.00 <br />(u) <br />Box Blade <br />1 <br />Hr. <br />NA <br />$ <br />50.00 <br />$ <br />50.00 <br />(v) <br />lWaterTruck <br />1 <br />Hr. <br />I NA <br />$ <br />120.00 <br />$ <br />120.00 <br />(w) <br />11000 gpm sump pump <br />1 <br />Hr. <br />NA <br />$ <br />25.00 <br />$ <br />25.00 <br />D2 <br />Crew Hourly Rates <br />(a) <br />Crew Man <br />1 <br />Hr. <br />NA <br />$ <br />45.00 <br />$ <br />45.00 <br />(b) <br />Foreman <br />1 <br />Hr. <br />NA <br />$ <br />75.00 <br />$ <br />75.00 <br />(c) <br />ISupervisor <br />1 <br />Hr. <br />NA <br />$ <br />100.00 <br />$ <br />100.00 <br />(d) <br />3 man crew includes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />285.00 <br />$ <br />285.00 <br />(e) <br />4 man crew includes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />325.00 <br />$ <br />325.00 <br />(f) <br />5 man crew includes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />400.00 <br />$ <br />400.00 <br />D3 <br />Overtime Crew Hourly Rates <br />(a) <br />I Crew Man <br />1 <br />Hr. <br />NA <br />$ <br />67.50 <br />$ <br />67.50 <br />(b) <br />Foreman <br />1 <br />Hr. <br />NA <br />$ <br />112.50 <br />$ <br />112.50 <br />(c) <br />Supervisor <br />1 <br />Hr. <br />NA <br />$ <br />150.00 <br />$ <br />150.00 <br />(d) <br />3 man crew includes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />427.50 <br />$ <br />427.50 <br />(e) <br />4 man crew Includes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />487.50 <br />$ <br />487.50 <br />(f) <br />15 man crew includes 1 supervisor <br />1 <br />Hr. <br />NA <br />$ <br />600.00 <br />1 $ <br />600.00 <br />12 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.