Laserfiche WebLink
IRC BID #2020039 Unit Item Cost Sheet <br />Indian River County Department of Utility Services 2020 Labor Contract <br />SCHEDULE"A" <br />Company Name: Blue Goose Construction LLC <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Material Unit <br />Price (Furnish) <br />Unit Price to <br />Install <br />Total Unit Price <br />(Furnish + Installation) <br />SECTION B - Restoration <br />B1 <br />Pavement Repair and Replacement <br />(a) Asphalt Road <br />1 <br />S.Y. <br />$ <br />15.00 <br />$ <br />50.00 <br />$ <br />65.00 <br />(b) Asphalt Driveway <br />1 <br />S.Y. <br />$ <br />15.00 <br />$ <br />30.00 <br />$ <br />45.00 <br />(c) Asphalt Millings <br />1 <br />S.Y. <br />$ <br />8.00 <br />$ <br />8.00 <br />$ <br />16.00 <br />(d) Asphalt overlay <br />1 <br />S.Y. <br />$ <br />15.00 <br />$ <br />10.00 <br />$ <br />25.00 <br />(e) Add. S-3 Asphalt <br />1 <br />Ton <br />$ <br />90.00 <br />$ <br />50.00 <br />$ <br />140.00 <br />(f) Cold Mix Asphalt <br />1 <br />Ton <br />$ <br />50.00 <br />$ <br />20.00 <br />$ <br />70.00 <br />(g) Concrete Driveway (6") <br />1 <br />S.Y. <br />$ <br />40.00 <br />$ <br />40.00 <br />$ <br />80.00 <br />(h) Concrete Sidewalk (4") <br />1 <br />S.Y. <br />$ <br />30.00 <br />$ <br />40.00 <br />$ <br />70.00 <br />(i) Concrete Curb <br />1. Curb and Gutter <br />1 <br />L. F. <br />$ <br />20.00 <br />$ <br />30.00 <br />$ <br />50.00 <br />2. V Curb <br />1 <br />L. F. <br />$ <br />20.00 <br />$ <br />30.00 <br />$ <br />50.00 <br />(j) Concrete Driveway Paver Block <br />1 <br />S.Y. <br />$ <br />15.00 <br />$ <br />30.00 <br />$ <br />45.00 <br />(k) Lime rock Driveway <br />1 <br />S.Y. <br />$ <br />15.00 <br />$ <br />10.00 <br />$ <br />25.00 <br />(1) Asphalt sidewalk <br />1 <br />S.Y. <br />$ <br />15.00 <br />$ <br />20.00 <br />$ <br />35.00 <br />B2 <br />Milling Asphalt <br />1 <br />S.Y. <br />$ <br />1.00 <br />$ <br />74.00 <br />$ <br />75.00 <br />B3 <br />Coquina Rock Base <br />1 <br />C.Y. <br />$ <br />20.00 <br />$ <br />20.00 <br />$ <br />40.00 <br />B4 <br />Flowable Fill <br />(a) 0 - 4 cy (include short load fees) <br />1 <br />C.Y. <br />$ <br />150.00 <br />$ <br />50.00 <br />$ <br />200.00 <br />(b) 4 - 8 cy (include short load fees) <br />1 <br />C.Y. <br />$ <br />150.00 <br />$ <br />50.00 <br />$ <br />200.00 <br />(c) > 8cy <br />1 <br />C.Y. <br />$ <br />90.00 <br />$ <br />50.00 <br />$ <br />140.00 <br />B5 <br />Miscellaneous Materials <br />(a) ISand <br />1 <br />C.Y. <br />$ <br />15.00 <br />$ <br />15.00 <br />$ <br />30.00 <br />(b) IFill <br />1 <br />C.Y. <br />$ <br />15.00 <br />$ <br />15.00 <br />$ <br />30.00 <br />(c) 1#57 Rock <br />1 <br />C.Y. <br />$ <br />40.00 <br />$ <br />15.00 <br />$ <br />55.00 <br />(d) Shell Rock <br />1 <br />C.Y. <br />$ <br />15.00 <br />$ <br />15.00 <br />$ <br />30.00 <br />(e) ISuremix Concrete 80# <br />1 <br />Bag <br />$ <br />5.00 <br />$ <br />15.00 <br />$ <br />20.00 <br />B6 <br />Sod Replacement <br />(a) <br />I Bahia <br />1 <br />S.Y. <br />$ <br />2.25 <br />$ <br />2.00 <br />$ <br />4.25 <br />(b) <br />Floratam <br />1 <br />S.Y. <br />$ <br />4.00 <br />$ <br />2.00 <br />$ <br />6.00 <br />B7 <br />Seed and Mulch <br />1 <br />S.Y. <br />$ <br />1.35 <br />$ <br />1.00 <br />$ <br />2.35 <br />B8 <br />Mailbox Removal and Reinstallation <br />1 <br />EA <br />$ <br />10.00 <br />$ <br />10.00 <br />$ <br />20.00 <br />B9 <br />Sprinkler System Repair per Yard <br />1 <br />EA <br />$ <br />5.00 <br />$ <br />50.00 <br />$ <br />55.00 <br />B10 <br />Handicap Ramp Restoration <br />1 <br />EA <br />$ <br />450.00 <br />$ <br />1,000.00 <br />$ <br />1,450.00 <br />10 of 13 <br />