Laserfiche WebLink
IRC BID #2020039 Unit Item Cost Sheet <br />Indian River County Department of Utility Services 2020 Labor Contract <br />SCHEDULE "A" <br />Company Name: Blue Goose Construction LLC <br />Item <br />No. <br />I <br />Description <br />I <br />Quantity <br />Unit <br />I <br />Material Unit <br />I Price (Furnish) <br />Unit Price to <br />Install <br />Total Unit Price <br />(Furnish + Installation) <br />SECTION C - High Density Polyethylene <br />Piping & Horizontal Directional Boring <br />C1 <br />High Density Polyethylene Pipe (HDPE) -Trench <br />(a) 2 -inch <br />1 <br />L. F. <br />$ <br />0.84 <br />$ <br />5.46 <br />$ <br />6.30 <br />(b) 4 -inch <br />1 <br />L. F. <br />$ <br />4.14 <br />$ <br />9.56 <br />$ <br />13.70 <br />(c) 6 -inch <br />1 <br />L. F. <br />$ <br />8.08 <br />$ <br />13.10 <br />$ <br />21.18 <br />(d) 8 -inch <br />1 <br />L. F. <br />$ <br />13.56 <br />$ <br />15.85 <br />$ <br />29.41 <br />(e) 12 inch <br />1 <br />L. F. <br />$ <br />29.04 <br />$ <br />23.96 <br />$ <br />53.00 <br />(f) 16 -inch <br />1 <br />L. F. <br />$ <br />51.04 <br />$ <br />30.96 <br />$ <br />82.00 <br />(g) 18 -inch <br />1 <br />L. F. <br />$ <br />66.00 <br />$ <br />39.00 <br />$ <br />105.00 <br />(h) 20 -inch <br />1 <br />L. F. <br />$ <br />80.96 <br />$ <br />51.04 <br />$ <br />132.00 <br />(i) 24 -inch <br />1 <br />L. F. <br />$ <br />112.64 <br />$ <br />60.36 <br />$ <br />173.00 <br />C2 <br />Horizontal Directional Boring (HDPE) -HDD <br />(b) 4 -inch <br />1 <br />L. F. <br />$ <br />4.14 <br />$ <br />35.56 <br />$ <br />39.70 <br />(c) 6 -inch <br />1 <br />L. F. <br />$ <br />8.08 <br />$ <br />61.10 <br />$ <br />69.18 <br />(d) 8 -inch <br />1 <br />L. F. <br />$ <br />13.59 <br />$ <br />66.85 <br />$ <br />80.44 <br />(e) 12 inch <br />1 <br />L. F. <br />$ <br />29.04 <br />$ <br />88.96 <br />$ <br />118.00 <br />(f) 16 -inch <br />1 <br />L. F. <br />$ <br />51.04 <br />$ <br />106.96 <br />$ <br />158.00 <br />(g) 18 -inch <br />1 <br />L. F. <br />$ <br />66.00 <br />$ <br />134.00 <br />$ <br />200.00 <br />(h) 20 -inch <br />1 <br />L. F. <br />$ <br />80.96 <br />$ <br />161.04 <br />$ <br />242.00 <br />(i) 24 -inch <br />1 <br />L. F. <br />$ <br />112.64 <br />$ <br />215.36 <br />$ <br />328.00 <br />C3 <br />Horizontally Directional Drilled -PVC Driveway Bores <br />20 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />44.00 <br />$ <br />21.00 <br />$ <br />65.00 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />88.00 <br />$ <br />27.00 <br />$ <br />115.00 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />110.00 <br />$ <br />30.00 <br />$ <br />140.00 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />132.00 <br />$ <br />33.00 <br />$ <br />165.00 <br />40 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />44.00 <br />$ <br />2,056.00 <br />$ <br />2,100.00 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />88.00 <br />$ <br />2,112.00 <br />$ <br />2,200.00 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />110.00 <br />$ <br />2,140.00 <br />$ <br />2,250.00 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />132.00 <br />$ <br />2,168.00 <br />$ <br />2,300.00 <br />60 -foot length <br />(a) 4 -inch <br />1 <br />EA. <br />$ <br />132.00 <br />$ <br />3,018.00 <br />$ <br />3,150.00 <br />(b) 6 -inch <br />1 <br />EA. <br />$ <br />176.00 <br />$ <br />3,024.00 <br />$ <br />3,200.00 <br />(c) 8 -inch <br />1 <br />EA. <br />$ <br />220.00 <br />$ <br />3,030.00 <br />$ <br />3,250.00 <br />(d) 12 -inch <br />1 <br />EA. <br />$ <br />264.00 <br />1 $ <br />3,036.00 <br />$ <br />3,300.00 <br />11 of 13 <br />