Laserfiche WebLink
ORDER NO. PSC -2020 -0212 -PAA -EQ <br />DOCKET NO. 20200114 -EQ <br />PAGE 12 <br />I L()RTDA p.cryER Sc GI 'r'CQ? A»NY <br />Attachment A <br />Third.Rcvised Sheet No, 9.034 <br />Cancels Second Sheet No. 9.034 <br />(Continued from Sheet No. 9:033.1) <br />.6. Testing Procedures <br />6.1 The Crortiitntt_d Capacity'fest tiiUst be eoriipleted.suceessfully-vtiigtin a siacty hour period (the "Deirioiistratioit Period"), tyhich <br />period, inclitcling'the pproximatc start time of the Committed Capacity Test, Shall be selected and scheduled by the QS by mean; of a Written <br />notice to FPL delivered at leasttlnriy (30) .days prior to the start of -such period. Theprovisions of the foregoing sentence shall not apply to <br />any Committed Capacity Test required by FPL under any of the provisions of this Contract. FPL shall have die right, to be' present onsite to <br />inonilor any Committed Caimeity Tut requited or let milted under this Cmtael. <br />6.2 Committed Capacity Test .results shall be based on"a test period of twenty four (21) consecutive hours (the "Committed <br />Capacity'fcst'Pencx17) at the highest an.taincd net .KW rating ofwhich Me Facility can operate without cx"eecdrng the design operating <br />conditions, teniperatnre, pressures, rind other parameters rt fined by the applicable manufacturer(s) for steady state operations at the Facility, <br />lithe QS is a REE the Cortniittcd Gtpacity Test shall be conducted utilizing as the sole fuel source fuels or energy sources included in: the <br />definition in Section 106.91, Florida Statutes. The Committed Capacity Test period shall iconupence et the time designated. by the QS <br />pursuant to Section 6.1 or at such other time requested by FPL pursuant to Section 5.3; provided, however, that the Coninutted Capacity Test <br />Period may commence earlier Than such time in the event that FPL is notified oL and consents to, such earliertirne. <br />6.3 ForOle avoidance of doubt, normal station service.use of unit auxiliaries, including. without limitation, cooling towers, heat <br />exchangers, and other egtupnrent requited by law, shall be in service &rim the Corrrnitled Capacity Test Period. Farther, the QS shall affect <br />deliveries of any cptantity and quality of contracted oogencrotcd steam to the steam host during the Committed Capacity Test Poriod. <br />6.4 The capacity_of the Facility shall be the average,net capacity'(generator output minus auxiliary) measured over the Committed <br />Capacity Test period. <br />6.5 The Con milted Capacity ''est shall be perfoniled according to prudent industry testing procedures setisfactory to 1 PL for the <br />appropriate technology of the QS. <br />6.6 Except as otherwise provided herein,.results of any Committed Capacity Test shall be submitted to FPL by the QS within seven <br />(7) days of the conclusion of the Cormnitted CapacityTest <br />7. Payment for Electricity Produced by the Facility <br />7.1 Enemy <br />FPL agrees to pay the QS for energy produced by the Facility and delivered to the,Delivery Point in accordarue with the rates and <br />procedures contained'in FPL's approved Rate'Schedule QS -2, attached hereto as Appendix A, as it may be amended from time to time and <br />pursuant to the 'election of energy payment options as specified in Appendix E. The Parties agree that this Contract shall be subject to all of <br />the provisions contained in Rate Schedule QS -2 as approved and on file with the FPSC. <br />7.2 Firm Capacity <br />FPL agrees 1p pay the QS for the lino capacity described in Section 5 in tecordance with the rotes and piocedtires contained in <br />Rate Schedule QS -2, attached hereto as Appendix A, at it may be amended and approved from time to time by the FPSC, and pursuant to the <br />election of a capacity, payment option as specified in Appendix E. The QS understands and agrees that capacity payments will be made under <br />the curly capacity payment options only if the QS las aelueved the Capacity. Delivery Date and is delivetirui firm capacity and energy to FPL. <br />Once elected by the QS. the capacity payment option cannot be changed during the temp of this Contract. <br />7.3 <br />Payments <br />Payments. due the QS will be made monthly and normally by the twentieth business day following the end of the billing period. A <br />statement of the kilowatt -hovers sold by the QS and the applicable avoided energyrate at which payments are being, made shall accompany the <br />payment to the QS. <br />(Continued on SheetNo.9.035) <br />Issued by: Tiffany Cohen, Director, Rates andTariffs <br />Effective: <br />