Laserfiche WebLink
ORDER NO. PSC -2020 -0212 -PAA -EQ <br />DOCKET NO. 20200114 -EQ <br />PAGE 13 <br />FLORIDA POWER & LiGIITCOMPANY <br />Attachment A <br />Sos entiThird Revised Sheet No. 9:034 <br />Cancels SecondFirst Sheet No.9.034 <br />(Continued from Sheet No. 9.033 1) <br />Testing Procedures <br />'6.1 The Coitttnitte4 Capacity Test Must be completed successfullywithin a sixty -hour period (the"Dentotstration Period'), which <br />period, including the approximate start tithe ofthe Committed Capacity7'ast, shall he selected and scheduled by the QS by roans ofa written <br />notice to FPL delivered at least tlurty,(30) days prior to the start of such period. The provisions of the foregoing sentence shall not apply to <br />arty Conitrtitted Capacity Test required by PPL wider any of the prtwisions of this Contract..FPL shill have the right to he present onsite to <br />monitor any Conuuittcd Capacity Tvst rcrpriaxi m permitted router this Contract. <br />6.2 Committed Copacity Test results shall he based on a test period of twenty-four (24) consecutive hours (the "Committed Capacity <br />Test Period") at the highest sustained net. KW rating at which the Facility can (Menne without exceeding etre design operatingconditiais, <br />temperature, pressures, and other parameters defined by the applicable manufacturer(s) for steady state operations at the Facility. Willa QS is <br />a REF the Committed Capacity Test shall be conducted utilizing as the sole fuel source fuels or cncrgy sources included in the definition in <br />Section 366.91, Florida Statutes. The Committed Capacity Test Period shall cm -tau -nee at the lime designated by the QS pursuant to <br />Section 6.1 or at such other time requested by FPL pursuant to Section 5.3; provided, however, that the Committed Capacity Test Period may <br />commence earlier than such time in the event that FPL is notified ol; and consents to; such earlier time. <br />6.3 For the avoidance of doubt, normal station service use of unit auxiliaries, including, without limitation, cooling towers. heat <br />exchangers, and other equipment required try law, shall be in service durirng the Committed Capacity Test Period. Further, the QS shall affect <br />deliveries of any cpuantityand quality of contracted cogeneratcd steam to the steam host during the Committed Capacity Test Period. <br />6.4 The capacity of the Facility shall be the average net capacity (generator output minus atuiliary) measured over the Committed <br />Capacity Test Period. <br />6.5 The Comnitted Capacity Test.shall be performed according to prudent industry testing procedures satisfactory to'FPL for the <br />appropriate technology of the QS. <br />6.6 Except as otherwise provided herein, results of any Committed Capacity Test shall be submitted to FPL by the QS within seven <br />(7) days of the concltniar of the Committed CapacityTesl. <br />7. Payment for Electricity Produced by the Facility <br />7.1 Energy <br />FPL agrees to pay the QS for energy produced by the Facility and delivered to the Delivery Point in accordance with the rates and <br />procedures contained in FPL's approved Rate Schedule QS -Z, attached hereto as Appendix A, as it may be amended from Gem to time and <br />purstamt to the -election of energy payment options as specified in Appendix E. The Parties agree that this Contract shall be subject to all of <br />the provisions contained in Rate Schedule.QS-2 as approved and on file with the FPSC. <br />7.2 Firm Capucity <br />FPL agrees to pay the QS for the finn capacity described in Section 5 in accordance with the rates and procedures contained in <br />Rate Schedule QS -2, attached hereto as Appendix A, as it may he amended and approved from time to time by the FPSC, and pursuant to the <br />election of a capacity payment option as specified in Appendix C. The QS understands and agrees that capacity payments will be made tinder <br />the early capacity payment options only if the QS has adder/ell the Capacity Delivery Data and is delivering fine space ity and energy to PPL. <br />Once elected by the QS, the capacity payment option cannot be changed during the tent of thisContract. <br />7.3 Payments <br />Payments: due the QS µill be made monthly and normally by the twentieth business day following the end of the billing period. A <br />statement of the hdlowatt-hours sold by. the QS and the applicable avoided energy rate at which payments are beingnnde shall accompany' the <br />payment to the QS. <br />•(Cemin ued on Sheet No.9.035) <br />Issued by: f1.=L RomIg3`ltram. Cohen. Director! Rates and Tariffs <br />Effective: Atptptt ber13,2016 <br />2 �c3 <br />