Laserfiche WebLink
ORDER NO. PSC -2020 -0212 -PAA -EQ <br />DOCKET NO. 20200114 -EQ <br />PAGE 14 <br />F RrnAPO\V ER &:I GFIT COMPANY <br />Attachment A <br />Steand Revised Sliect NY . 9.035 , <br />Cancels First Sheet. NO. 9.035. <br />(Continued from Sheet No. ).034) <br />8. Electricity Production and Plant Maintenance Schedule <br />8.1 Daring the toninof this Contract, no later than Sixty (60) daYs:priot to the Capacity,DeliveryD4(eand print to April.1 of each <br />calendar year thereafter, the QS shall submit to FPI. in writing a detailed plan of (a) the amount of firm capacity and energy to be generated <br />by the facility and delivered to the Delivery Point for each month of the following:calendar year, and (b) the time, duration and magnitude of <br />anysehcdtded maintenance: peripd(s) and any anticipated reductions, in capacity. <br />8.2 13y.Qctober 3l- of each calendar year, FPL shall notify the QS in writing whether the requested scheduled maintenance periods <br />in the detailed 1>lan arcaceeptable. If FPL objects to any ofthc requested scheduled maintenance periods, FPi, shall advise the QS of the time <br />• period closest to the requested period(s) when the outage(s) can be scheduled. The QS shall schedule maintenance outages only during <br />periods approved by FPL, such approval not unreasonably withheld. Once the schedule for maintenance has been established and approved <br />by FPL, either Party may request a subsequent change in such scladule and, except when such event is due to Force Majeure, request <br />approval for such change from the other Puny, such approval not to be unreasonably withheld or delayed. Scheduled maintenance outage <br />days shall be limited to seven (7) days per culcndar. year unless the inanufaeturcT's rccommmandation of rriainlcnarnc outage e days. kr the <br />• technology and equipment used by the Facility exceeds such 7 day period, provided, such number of days is considered reasonable by <br />prudent industry standards and docs not exceed two (2) fourteen (14) day intervals, one in the Spring and one in the Fall, in any calendar <br />-year.: Tb scluedu led maintenance cndagc days applicahlc for the QS arc_ ,_,_ days in the Spring and days in the Fall ofcach calendar <br />year;:ptotidcd the conditions specified in the previous sentence are satisfied. in no event shall maintenance periods be scheduled dunni the <br />following periods: June i through and including October 31st and December 1 through and including February 28 (or 29`' as the case may <br />be). <br />8.3 The QS shall Comply with reasonable requests by FPL regarding day -to -day -and hour -by -hour eomnnutication between tllc <br />Parties relative to electricity production and maintenance scheduling. <br />R.4 Dispatch and Control <br />8.4.1 The power supplied by the QS heietnider shall be m the fomi of three-phase 60 Hertz alternating current, at a nommnal <br />operating voltage of 000 volts ( kV) and power factor dispatchahtc and controllable in the range of 85% lagging to <br />85% leadngas measured at the Delivery Point to maintain system operating parameters, as specified by FPL. <br />8.4.2 At all times during the terns of this Contract, the QS shall operate and maintain the Facility: (a) in such a manner as to ensure <br />compliance with its obligations hereunder, in accordance with prudent engineering and operating practices' and applicable lair, and (b) with <br />all system protective equipment in service whenever the Facility is connected to, or is operated in parallel with, FPL's system. The QS shall <br />install at the Facility those system protection and control devices necessary to ensure safe and protected operation of all energized equipment <br />during noinrul testing crud' repair. The QS shill have qualified personnel test and calibrate all prolective equipinertt at regular,intetvals in <br />accordance with good engineering and operating practices. A unit functional trip test shall be performed after each overhaul of the Facility's <br />turbine, generator or boilers and the results stall be provided to FPL prior to returning the Futility to service. The specifics of the unit <br />functional trip test will be cornislent. with pocxl cnfinccring and operating pntclices. <br />8.4.31f the Facility is separated from the FPL system for any reason, under no circumstances shall the QS reconnect the Facility <br />into FPL's system without first obtaining FPL's prior written approval. <br />8.4.4 Daring the term of this Contract, the QS shall employ qualified personnel for managing, operating and maintaining Ute <br />Facilityand for coordinating such with FPL. If the Facility, has a Conanitted Capacity greater than 10 MW ,liten, the QS shall erasure that <br />operating personnel are on duty at all times, twenty-four (24) hours a calendar day and seven (7) calendar days a week. If the Facility has a <br />Contained Calxicity equal to or less than 10 MW then the QS shall ensure that operating personnel are on May ut horst eight (8) hours per <br />day from 8 AM EST to 5 PM EST from Monday to Friday, with an operator on call at all other hours. <br />8.4.5 FPL shall at all tints be excused from its obligation to purchase and receive energy and capacity hereunder, and FPL shall <br />have .the ability to require the QS to curtail or rcducc deliveries of energy,' to the extent necessary (a) to maintain the reliability and integrity <br />of anypart of EPL's systery (b) int the event that FPL detemunas that a failure to do so Is likely to endanger li fe or property, of (c) is likely to <br />result in significant disruption of electric service to FPL's customers. FPi. shall give the QS prior notice, if practicable, of its intent to refuse, <br />curtail or reduce FPL's acceptance of energy and fine capacity pursuant to this Section and Will act to minimize the frequency and duration <br />of such occurrences. <br />(Continued on Sheet No. 9.036) <br />Issued by: S, E. Romig, Director, Rates and Tariffs <br />Effective: September 13, 2016 <br />2 � c4 <br />