My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/07/2020
CBCC
>
Meetings
>
2020's
>
2020
>
07/07/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 2:15:38 PM
Creation date
8/12/2020 1:15:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/07/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2020 -0212 -PAA -EQ <br />DOCKET NO. 20200114 -EQ <br />PAGE 46 <br />Attachment A <br />FLORIDA POWER & LIGITr COMPANY Original Sheet No. .10315 <br />APPENDLX D <br />TO THE STANDARD OFFER CONTRACT <br />DETAILED PROJECT INFORMATION <br />Each eligible Contract received by FPI, will be evaluated to determine if the underlying QS project is financially and technically Liable. The <br />QS shall, to the e;<ienravailahle, provide FPI, with a dctailad project proposal which addresses the information requested below. <br />I. FACILITY D'CSCRIMION <br />• PrgjectName <br />• Project Location <br />$ Street Address <br />• Site PlotPlan <br />• Legal Description of Site <br />• Generating 1'ecimology <br />• Facility Classification (include types .fron1statute) <br />• Primary Fuel <br />• Alternate .Fuel (if applicable) <br />• Committed Capacity <br />• :Fxpectedln-Scrvici: Date <br />• Stcsm Host (forcngeneration facilities) <br />a Street Address <br />• Legal Description of Steen) Host <br />+ Host's annual steam requirements (lbsfyr) <br />• Contact Person <br />a Individual's Naine and Title <br />♦ Company Warne <br />• Address <br />• Telephone NuMber <br />• `TeleeopyNurnber <br />II. PROJECT PARTICIPANTS <br />• Indicate the entities responsible for the following project management activities and provide a detailed description of the <br />e\perieriee and capabilities of the entities: <br />+ Project Development. <br />• Siting and Licensing the Facility <br />♦ Designing the Facility <br />♦ Constructing the Facaity <br />• Securing the Fuel Supply <br />• Operating the Facility <br />• Provide details on all electrical generation facilities which are currently under construction or operatiowl which were <br />developed by the QS. <br />• l)eSciil a the financing stnrctu re for the projects identified above, including the type of financing ttsed, the pe❑nanent financing <br />tern; the,najor lenders, and the percentage of equity invested at financial closing. <br />(Cdntirttied on Sheet No. 10.30) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: May 22, 2007 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.