Laserfiche WebLink
ORDER NO. PSC -2020 -0212 -PAA -EQ <br />DOCKET NO. 20200114 -EQ <br />PAGE 47 <br />FLORIDA POWER & LTGUIT COMPANY <br />Attachment A <br />Original Sheet No. 10.316 <br />(Continued from Sheet No. 10.315) <br />Ill. FUEL SUPPLY <br />• Describe all fuels to be used to generate electricity at the Facility. Indicate the specific physical and chemical characteristics <br />of each fuel type (e.g., Btu content, stair content, ash content, ctc). Identify special considerations regarding fuel supply <br />origin, source and handling, storage and processing requirements. <br />• Protide annual fuel requirements (AFR) ncccssary,to support the requirements pursuant to Section 366.91, Florida Statutes, <br />and the planned levels of generation and list the asstiinptions used to detemtine these quantities. <br />• Provide a summary of the status of the fuel supply arrangements in place to meet the ARFR in each year of the proposed <br />operating life of the Facility. Use the categories below to describe the current arrangement for securing the AFR. <br />Category Description of Fuel Supply Arrangement fuel is from a fully developed <br />owned = source owned by one or more of the project participants <br />contract r. fully executed frnn fuel contract exists between the developer(s) and fuel supplier(s) <br />I;ql = a letter of intent for the Mel supply exists between developer(s) and fuel supplier(s) <br />REF = renewable energy facility will burn biomass, waste, or another renewable resource <br />spot = filet supply will be purchased an the spot market <br />none = no firm fuel supply arrangement currently in place <br />other = fuel supply arrangement which does not fit any of the above categories (please describe) <br />• Indicate the percentage of the Facility's AFR which is covered by the above fuel supply arrangement(s) for each proposed <br />operating year. The percent of AFR covered for each operating year must total 100%. For fuel supply arrangements identified <br />as owned, contract, or LOI, provide documentation to support this category and explain the fuel price mechanism of the <br />arrangement. 1n addition, indicate whether or not the fuel price includes delivery end, if so, to what location. <br />• Describe fuel transportation networks available for delivering all primary and secondary fuel to the Facility site. Indicate the <br />mode, route and distance of each segment of the journey, from fuel source to the Energy Facility site. Discuss the current <br />status and pertinent factors impacting future availability of tot transportation network. <br />• Provide annual •fuel transportation requirements (ATTR) necessary to support planned levels of generation and list the <br />assumptions used to determine these quantities. <br />• Provide a summary of the status of the fuel transportation arrangements in place 10 meet the AVER in each year of the <br />proposed operating life of the Energy Facility: Use the categories below to describe the current arrangement for securing the <br />AFTR. <br />owned = <br />contract <br />IAA = <br />Spot = <br />none = <br />other = <br />fitel transport via a fully developed system owned by one or more of the project participants <br />fully executed firm transportation contract exists betweeni the developer(s) and fuel trtutsporter(s) <br />a lcttcr of intent for flet transport exists between developer(s) and fuel transporter(s) <br />fuel transportation will be purchased on the spot market <br />no firm fuel tratspuirtation arrangement cuarauly in place <br />fuel transportation arrangement which does not 6t any of the above categories (please describe) <br />• indicate the percentage of the Facility's AFR which is covered by the above fuel supply arrangement(s) for each proposal <br />operating year. The percent of AFR covered for each operating year must total 100%. For fuel supply arrangements identified <br />as owned, contract, or L01, provide documentation to support this category and explain the transportation price mechanism of <br />the arrangement. <br />• Provide the maximtan,rninimum,and average fuel inventory levels to be maintained for primary and secondary fuels at the <br />Facility site. List the assumptions used in determining the inventory levels. <br />(Continued on Sheet No. 10.317) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: May22,2007 <br />2A-1 <br />