My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2020 (3)
CBCC
>
Meetings
>
2020's
>
2020
>
05/19/2020 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:27 PM
Creation date
8/19/2020 1:06:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
58A .Addedrip-rap endwall and pipe bedding to south culvert in Jungle Trail per IRC right-of- <br />way permit comments. <br />60A Revised north culvert in Jungle Trail from 60"06" box culvert to a 53"04" elliptical <br />reinforced concrete pipe due to fabrication delays with the box culvert. Added rip -rap <br />endwall and pipe bedding per IRC right-of-way permit comments. <br />67A Eliminated bid items for fencing and Owner direct purchased split -rail fencing. Hog wire <br />& 68A fencing, guard rail, and pole gate materials are.being provided by the contractor / fence <br />contractor. The revision resulted in a credit from the original bid. <br />69A Added pressure treated bulkheads at ends of boardwalks for slope transition to walking <br />trail. <br />73A Supply for wild flower seed for purchase by Owner were not available as per bid. <br />Contractor purchased seed directly and hydroseeded garden, wetland top of bank, and ditch <br />banks to prevent erosion until wetland plantings are installed. <br />Change Order 002 <br />The fees presented in change order 002 were a result of. the coordination with FPL, AT&T, and <br />Comcast to remove the existing overhead lines that run through the center of the proposed parking <br />lot and install underground with services to the proposed restroom pavilion and existing structures. <br />It should be noted that the existing overhead facilities were not located within a recorded easement <br />on the property. <br />The following is a breakdown of the of the necessary materials .to be .installed for the utility <br />providers. All of the items presented in change order 002 were not part of the original scope of <br />work. <br />FPL <br />0 205 IF directional bore for 2 -inch conduit from handhole at new pole location to service <br />pavilion. <br />0 220 LF directional bore for 2 -inch conduit (material provided by FPL) for primary. <br />AT&T <br />e 220 LF directional bore 2 -inch conduit for primary. <br />0 135 LF directional bore 1.5 -inch conduit from handhole to service house <br />Comcast <br />0 135 LF directional bore 2 -inch conduit from handhole to service house <br />—ITI SerA nuida <br />PA18-39 Jones Pier)ConstructionlCorrespondencelCOP1-2 Narrative.dou Page 2 of 3 socc 1911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.