My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2020 (3)
CBCC
>
Meetings
>
2020's
>
2020
>
05/19/2020 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:09:27 PM
Creation date
8/19/2020 1:06:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/19/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARTER ASSOCIATES, INC. <br />CONSULTING ENGINEERS AND LAND SURVEYORS <br />1708 21st STREET- VERO BEACH, FLORIDA 32960-3472 - 772.562-4191 - 772-562-7180 (FAX) <br />JOHN H. BLUM, P.E., PRINCIPAL <br />DAVID E. LUETHIE, P.S.M.• PRINCIPAL <br />GEORGE A.SIMONS. P.E., PRINCIPAL <br />PATRICK S. WALTHER, P.E., PRINCIPAL <br />MARVIN E. CARTER, P.S.M., Consultant to the Finn <br />DEAN F. LUETIVE, P.E., ,n.a nr) Consiilt:mt to flit Erin <br />May 8 2020 <br />Ms. Elizabeth Powell <br />Assistant. Director, Parks & Conservation Resources <br />Indian River County <br />550077 1h Street <br />Vero Beach, Florida 32967 <br />Attachment 1 <br />FRANK S. CUCCURESE, P.S.M. <br />CLINTON J. RAHIES, V.E. <br />TYLER N. SPENCER, P.E. <br />RE: Jones Pier Wetland Restoration and Conservation Improvements <br />Change Order Description <br />Dear Beth: <br />Please see below a brief description of the attached change order items provided by the contractor, <br />XGD Systems LLC: <br />Change Order 001 <br />18A Bid plans by Architect did not provide for lighting in the restrooms but were added later <br />during the building permit approval process. <br />49A Statement. on phase 1 drawings indicates all passing density tests shall be paid. by the <br />County. <br />52A Phase 2 drawings provided for rip -rap rubble in bottom of north outfall ditch. Owner's <br />representatives revised this area to be stabilized with fiber mat and planted with native <br />grasses. The rip -rap rubble will be re -purposed on-site. <br />53A Add 60 lineal feet of rip -rap revetment along the north bank of the south ditch adjacent to <br />the parking lot entrance to stabilize ditch bank from adjacent stormwater runoff. <br />56A The existing grade transition from the rear yards of the homesites north of the north ditch <br />created a slope in the ditch bank that caused concerns for future erosion. The sloping along <br />with vegetation removal in this area made it necessary to shift the walking trail south to <br />allow more room to re -stabilize the ditch bank. <br />Serving Florida <br />PA18-39 Jones PieAconstructionlCorrespondenceCCOP1-2 Narrative.dou Page 1 of 3 i L ILA Since 19I l <br />91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.