My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-146
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 9:46:29 AM
Creation date
9/3/2020 10:52:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/18/2020
Control Number
2020-146
Agenda Item Number
8.R.
Entity Name
Federal Emergency Management Agency (FEMA)
Subject
Subaward and grant agreement for COVID-19
agreement number Z1841
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATRUE COPY <br />CERTIFICATION ON LAST PAG5 <br />J.R. SMITH, CLERK <br />the percentage of completion of the work that the reimbursement request represents, that <br />disbursements or payments were made in accordance with all of the Agreement and <br />regulatory conditions, and that reimbursement is due and has not been previously <br />requested. <br />B. AIA Forms G702 and G703. For construction projects where an architectural, <br />engineering or construction management firm provides construction administration <br />services, the Sub -Recipient shall provide a copy of the American Institute of Architects <br />(AIA) form G702, Application and Certification for Payment, or a comparable form approved <br />by the Division, signed by the contractor and inspection/certifying architect or engineer, <br />and a copy of form G703, Continuation Sheet, or a comparable form approved by the <br />Division. <br />Five percent (5%) of the total eligible amount (including Federal, State and Local shares) for each payment <br />request will be retained until the final Request for Reimbursement (or backup for advance expenditure) has <br />been verified as acceptable by the Division's Grant Manager, which must include dated certification that <br />the Project is 100% complete. Further, all required documentation must be available in FDEM Grants <br />Management System prior to release of the retained amount, to include permits, policies & procedures, <br />procurement and insurance documents. At such time all required activities and documentation <br />requirements have been verified as performed and met, the Sub -Recipient may request the total retained <br />amount. <br />Small Projects Deliverables <br />Small projects will be paid upon obligation of the Project Worksheet and execution of the subgrant <br />agreement. Sub -Recipient must initiate the Small Project Closeout in FDEM Grants Management System <br />within thirty (30) days of completion of the project work, or no later than the period of performance end date. <br />Small Project Closeout is initiated by logging into FDEM Grants Management System, selecting the Sub - <br />Recipient's account, then selecting 'Create New Request', and selecting 'New Small Project <br />Completion/Closeout'. Complete the form and 'Save'. The final action is to advance the form to the next <br />queue for review. <br />Financial Consequences: <br />For any Project (PW) that the Sub -Recipient fails to complete in compliance with Federal, State and Local <br />requirements, the Division shall withhold a portion of the funding up to the full amount. <br />2 CFR 200.338 and section 215.971, Florida Statutes, requires the Division, as the recipient of Federal <br />funding, to apply financial consequences, including withholding a portion of funding up to the full amount in <br />the event that the Sub -Recipient fails to be in compliance with Federal, State, and Local requirements, or <br />satisfactorily perform required activities/tasks. The Division shall apply the following financial <br />consequences in these specifically identified events: <br />Work performed outside the Period of Performance — <br />Based on 2 C.F.R. Section 200.309, a Sub -Recipient may be reimbursed for eligible costs incurred for work <br />performed within the period of performance. Costs incurred as a result of work performed outside of the <br />period of performance will be deemed not allowable and ineligible for reimbursement by the Division. <br />If the Sub -Recipient does not anticipate finishing the work within the original period of performance, it must <br />request a time extension and support that the work cannot be timely completed due to extenuating <br />circumstances beyond the Sub -Recipient's control (Attachment G). <br />Additionally, if the project is not completed within the period of performance and a time extension request <br />was not granted, the Division will coordinate with the Federal Awarding Agency to adjust the costs obligated <br />amount to reflect the actual allowable costs incurred during the period of performance. <br />Failure to submit quarterly reports timely — Pursuant to 2 C.F.R. Section 328, the Division is responsible <br />for oversight of the operations of the Federal award supported activities. Section 215.971, Florida Statutes <br />provides the Division must monitor the activities performed under Federal awards to assure compliance <br />with applicable Federal and State requirements and gain assurances that performance expectations are <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.