My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-157C
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-157C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:01:38 AM
Creation date
9/10/2020 10:59:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/18/2020
Control Number
2020-157C
Agenda Item Number
8.AI.
Entity Name
MBV Engineering, Inc.
Subject
Hallstrom House Farmstead various site improvements Work Order 18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Indian River County Final Concurrency <br />• Indian River County Stormwater <br />• Indian River County ROW <br />• Indian River County Utilities Approval <br />• Indian River County Fire Department Approval <br />• FDEP Domestic Wastewater <br />• SIRWMD 10-2 Self Certification for Stormwater Design <br />Modeling, Calculations & Reports <br />• Stormwater Modeling for Dry Pond Design <br />• Development of Stormwater Calculations in accordance with regulatory requirements <br />• Development of Final Stormwater Report for Permit Submissions <br />• Development of Private Lift Station Calculations <br />• Development of Final Lift Station Report for Permit Submissions <br />No endangered species, wetlands or other ecological permitting is anticipated or included herein. It <br />should be noted that the site may have existing gopher tortoises and that ail coordination and <br />permitting associated with the relocation of the tortoises will be provided by the County. <br />The Consultant shall respond up to three (3) requests for additional information by the permitting <br />agency. <br />The County will be responsible for all permit fees and the Consultant will prepare all necessary <br />applications and provide to County for signature. <br />Task 6: Architectural Design <br />Architect / MEP/ Structural <br />• Establishment of design criteria for the proposed 320 SF Restroom Facility <br />• On-site visit for field verification of the existing site conditions. <br />• Preparation of architectural construction documents consisting of floor plans, elevations, <br />roof plans and details, life safety plan, code review, schedules, general/construction details, <br />notes and specifications. <br />• Coordination with MEP and Structural. <br />• Coordination with Owners Civil Engineer. <br />• Establish design criteria for ventilation, electrical and plumbing. <br />• Construction documents and specifications for electrical and plumbing, which include but <br />are not limited to: floor plans, schedules, electrical and plumbing risers, electrical panels, <br />reflected ceiling plans, details, etc. <br />• Utility coordination for new electrical service. <br />• Establish structural design criteria <br />• Review of soil investigative reports as provided by Owner. <br />• Design and preparation of the following: <br />o Foundation plans and sections based on a conventional shallow foundation system with <br />a minimum allowable soil bearing pressure of 2,000 psf. <br />o Roof framing plan and sections. <br />o Wind design pressures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.