My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-159
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:04:06 AM
Creation date
9/10/2020 11:04:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/18/2020
Control Number
2020-159
Agenda Item Number
8.AL.
Entity Name
Masteller & Moler, Inc.
Subject
Engineering services for Fran B. Adams North County Regional Park
(Playground and soccer complex area) restroom facility Work Order 2 RFP 2018008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task B — Engineering Design & Preparation of Construction Plans <br />Masteller & Moler, Inc. shall use the aforementioned Base Plans for design and preparation of Construction <br />Plans for the location and requirements for the new restroom building, gravity sewer, and potable water main <br />extensions. Consultant shall prepare plans and specifications which shall include requirements for connection <br />of the new utilities to existing systems and requirements for the extension of the existing utilities. <br />Task C — Minor Site Plan Approval <br />A Pre -Application Conference with the Technical Review Committee (TRC) was held on April 27th, 2020 to discuss <br />the Project requirements based on a Conceptual Site Plan that was submitted along with the Conference <br />request. Masteller & Moler, Inc. shall utilize the aforementioned design and construction plans for submittal to <br />the County Planning Department to secure Minor Site Plan Approval based on comments provided by TRC Staff <br />at the pre -application conference. The Plans shall include improvements necessary to facilitate Minor Site Plan <br />Approval generally including but not limited to: <br />• Location of the proposed restroom building (building elevations & specifications provided by others); <br />• Location of the proposed utilities extensions; <br />• Concrete sidewalk leading to and from the restroom building and ADA compliant parking spaces, if <br />required. <br />Following the submittal, we shall complete any required additional rounds of responses following the first round <br />based on hours expended multiplied by the appropriate job classification rate set forth in Exhibit 1 attached to <br />the Agreement for a fee not to exceed $1,780.00. <br />Task D — Soils Engineering Services <br />Masteller & Moler, Inc. shall use the services of our soils engineering sub -consultant KSM Engineering & Testing <br />to provide soil engineering services for the project as follows: <br />• Perform two (2) hand auger soil borings to a depth of 8' along the proposed utility extension routes; <br />• Perform two (2) soil borings to a depth of 10' under the proposed restroom building location; <br />Provide a report detailing all findings and conclusions as to the suitability of the subsurface soils for <br />the project. <br />Task E — Electrical Engineering Services <br />Masteller & Moler, Inc. shall use the services of our electrical engineering sub -consultant Treasure Coast <br />Engineering to provide electrical engineering services for the project for the restroom building site. The electrical <br />engineering services will generally include the evaluation of the existing power to the site (if any) to determine <br />the suitability for the project's needs, interfacing with the power utility to ensure adequate power is delivered <br />to the restroom building site, and furnishing of electrical plans and diagrams as necessary. <br />Exhibit A — Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.