My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-159
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:04:06 AM
Creation date
9/10/2020 11:04:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/18/2020
Control Number
2020-159
Agenda Item Number
8.AL.
Entity Name
Masteller & Moler, Inc.
Subject
Engineering services for Fran B. Adams North County Regional Park
(Playground and soccer complex area) restroom facility Work Order 2 RFP 2018008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverables—The ENGINEER shall provide the COUNTY: <br />a. 60% Construction Plans and Preliminary Specifications — 1 Hard Copy + PDF <br />b. Final Construction Plans - 2 Sets + PDF <br />C. Bid Documents and Final Specifications necessary for Advertisement and Bidding of the work <br />d. Related digital AutoCAD, DOC, and PDF files <br />TIME SCHEDULE <br />Project shall be completed as follows: <br />Engineering Design & Preparation of Construction Plans (after NTP Receipt) 60 Working Days <br />Submittal of Permit Applications (after NTP Receipt) 80 Working Days <br />FEE SCHEDULE <br />Consultant proposes to provide the outlined Scope of Services based on the following lump sum fees: <br />Task A — Surveying Services <br />$ <br />4,800.00 <br />Task B — Engineering Design & Preparation of Construction Plans <br />$ <br />13,900.00 <br />Task C — Minor Site Plan Approval <br />$ <br />2,930.00 <br />Additional rounds of responses, hourly NTE (if necessary) <br />$ <br />1,780.00 <br />Task D —Soils Engineering Services <br />$ <br />1,540.00 <br />Task E — Electrical Engineering Services <br />$ <br />3,850.00 <br />Task F — Permitting <br />$ <br />8,080.00 <br />Task G — Bidding Services and Specifications <br />$ <br />6,220.00 <br />Task H — Construction Administration Services <br />$ <br />4,510.00 <br />Total Lump Sum Fee <br />$ <br />47,610.00 <br />File#20016 <br />(20016_WorkOrder2-ExhibitA_20-0428.docx) <br />Exhibit A — Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.