My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-161
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:22:28 AM
Creation date
9/10/2020 11:15:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/18/2020
Control Number
2020-161
Agenda Item Number
8.AP.
Entity Name
Arcadis US, Inc. fka Arcadis G&M, Inc.
Subject
Bridge replacement and widening of 66th Avenue from South of SR60 to North of 57th Street
Amendment No. 17
Project Number
IRC-05452020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRIDGE REPLACEMENTS AND WIDENING OF 66TH AVENUE <br />FROM SOUTH OF SR 60 TO NORTH OF 57TH STREET <br />IRC PROJECT NUMBER 0545 <br />PROFESSIONAL CIVIL ENGINEERING & STRUCTURAL ENGINEERING <br />SERVICES <br />AMENDMENT NO. 17 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING <br />SERVICES AGREEMENT BETWEEN ARCADIS US, Inc. (fka ARCADIS G&M, Inc.), <br />Inc. AND INDIAN RIVER COUNTY, FLORIDA. <br />This is an amendment to the existing Engineering Services Agreement (AGREEMENT) dated <br />September 6, 2005 between ARCADIS US, Inc. (ENGINEER) and Indian River County <br />(COUNTY). This amendment addresses changes in "Section III - Scope of Services", and <br />"Section V - Compensation". <br />Amendment Description <br />This Amendment includes the following: <br />"SECTION III — SCOPE OF SERVICES" is being modified as identified below. <br />1. Modify the Existing 53rd Street Bridge Plans to incorporate: <br />• Five -lane (12 -foot) cross section <br />West Bound —1 Left, 1 Through, 1 Through/Right <br />East Bound — 2 Lanes <br />• Eight -foot shoulders <br />• Concrete barrier separated 8 -foot sidewalk <br />• Guardrail shielding of canal along south side of 53rd Street approach <br />2. Design mast arm signalization at the Intersection of 53rd Street and 66'' Avenue <br />including: <br />• Signal Plan <br />• Easement Coordination <br />• Structural Analysis <br />• Warrant Study <br />• Utility Coordination <br />• Geotechnical Testing <br />• Subsurface Underground Excavation for mast arm supports <br />3. Modify Landscape and Irrigation Plans for medians on 66th Avenue to <br />accommodate the expanded bridge section identified in Paragraph 1. <br />Pagel of 3 <br />G:\LNR Support\Proposals\WPB\2020\Indian River County\66th AVE AMENDMENT 17 8-7-20.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.