My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-161
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:22:28 AM
Creation date
9/10/2020 11:15:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/18/2020
Control Number
2020-161
Agenda Item Number
8.AP.
Entity Name
Arcadis US, Inc. fka Arcadis G&M, Inc.
Subject
Bridge replacement and widening of 66th Avenue from South of SR60 to North of 57th Street
Amendment No. 17
Project Number
IRC-05452020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Subconsultant Coordination throughout design and permitting process <br />5. Modify Roadway and Signing and Marking plans to accommodate the expanded <br />bridge section identified in Paragraph 1. <br />6. The preparation of a request for a Major Modification to the previously issued St <br />Johns River Water Management District Permit. Existing Permit No. 4-061- <br />87006-5 expired on May 12, 2019 following the completion and certification of <br />Phase I of the project. The scope and fee included in this amendment is <br />associated with the completion and submittal of a request for a modification to <br />allow construction of Phase 2 of the project from Sta 294+93 (north of 49th <br />Street) to Sta 354+00 (north of 57th Street). <br />7. Prepare Flood Plain Model request to FEMA and prepare flood plain modeling <br />study in support of a No Rise Certification <br />8. Prepare a CLOMR submittal should the flood plain study not result in a No Rise <br />Certificate (Optional if agreed to by Indian River County) <br />"SECTION V — COMPENSATION" is being modified to incorporate the following: <br />The COUNTY agrees to pay and the ENGINEER or agrees to accept for services rendered <br />pursuant to this Agreement fees in accordance with the following: <br />A. Professional Services Fee <br />The basic compensation mutually agreed upon by the ENGINEER and the <br />COUNTY follows: <br />1. Preparation of modified bridge plans (WGI) Lump Sum $47,610.00 <br />la. Assistance with Bridge permitting (WGI) Lump Sum $ 5,780.00 <br />2. Design Mast Arm Sign alization Plan (S& N) Lump Sum $56,000.00 <br />3. Modify Landscape & Irrigation Plans (Lucido) Lump Sum $ 5,000.00 <br />4. Subconsultant Coordination Fee (5%) Lump Sum $ 5,719.50 <br />5. Modify Roadway, Signing and Marking Plans Lump Sum $32,150.00 <br />6. Preparation and processing of Major Modification <br />to SJR WMD Permit No 4-061-87006. <br />7. Flood Plain Model request and preparation of <br />Flood Plan Model and No Rise Certificate <br />Lump Sum $ 2,850.00 <br />Lump Sum $25,300.00 <br />Lump Sum $180,409.50 <br />Page 2 of 3 <br />G:\LNR Support\Proposals\WPB\2020\lndian River County\66th AVE AMENDMENT 17 8-7-20.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.