My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-162
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:23:20 AM
Creation date
9/10/2020 11:18:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/18/2020
Control Number
2020-162
Agenda Item Number
8.AQ.
Entity Name
Kinley-Horn & Associates, Inc.
Subject
43rd Avenue Bridge replacement over S. Relief Canal Work Order 33
Project Number
IRC-2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. General Notes <br />B. Plan and Elevations <br />C. Foundation Layouts and <br />Pile Data Table <br />Work Order No. 33 <br />43rd Avenue/ S. Relief Canal <br />Bridge Replacement Project <br />D. End Bent Layouts <br />E. Pile Bent Layouts <br />F. Framing Plans <br />G. Typical Section <br />The Bridge Plans will be produced in CADD format and placed on 11"x17" sheets and <br />provided in PDF format. <br />2. 90% Bridge Plans: <br />In this phase the bridge plans will be brought up to 90% complete and submitted to the <br />County for review concurrent with the 90% roadway plans. The 90% Bridge Plans will <br />consist of the following type of sheets: <br />A. <br />General Notes <br />B. <br />Plan and Elevations <br />C. <br />Foundation Layouts <br />D. <br />End Bent Layouts <br />E. <br />End Bent Details <br />F. <br />Pile Bent Layouts <br />G. <br />Pile Bent Details <br />H. <br />Finish Grade Elevations <br />I. <br />Framing Plans <br />J. <br />Typical Sections <br />K. <br />Superstructure Layouts <br />L. <br />Superstructure Details <br />M. <br />Beam Data Sheets <br />N. <br />Approach Slabs <br />0. <br />Bar Reinforcing List <br />Along with this submittal the Bridge Design Calculations and the Bridge Load Rating <br />Calculations will be submitted based on the 90% Plans. The Designs and Load Rating <br />Calculations will utilize the Florida Department of Transportation (FDOT) Structures <br />Design Manual. The 90% Plan Quantities will also be provided along with a Probable <br />Opinion of Construction Cost based on FDOT statewide averages. The 90% Bridge will <br />be produced in CADD format and placed on 11"x17" sheets and provided in PDF format. <br />The design and load rating calculations will also be provided in PDF format. The Bridge <br />Specifications will be based on the FDOT Standard Specifications for Road and Bridge <br />Construction. <br />3. Final Bridge Plans: <br />For this phase we will submit the Final Signed and Sealed Bridge Plans, Design <br />Calculations, Load Rating Calculations, Quantities and the Probable Opinion of <br />Construction Cost based on FDOT statewide averages. <br />
The URL can be used to link to this page
Your browser does not support the video tag.