My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-162
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:23:20 AM
Creation date
9/10/2020 11:18:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/18/2020
Control Number
2020-162
Agenda Item Number
8.AQ.
Entity Name
Kinley-Horn & Associates, Inc.
Subject
43rd Avenue Bridge replacement over S. Relief Canal Work Order 33
Project Number
IRC-2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 33 <br />43rd Avenue/ S. Relief Canal <br />Bridge Replacement Project <br />11" x 17" sheets. <br />2. Plan sheets shall depict existing right-of-way, section lines, property lines, temporary <br />construction easements, and centerline of construction. Horizontal control points with <br />state plane coordinates for all PC's, PT's, curve radius, curve length and horizontal PI's <br />shall be included on the Plan or summarized in an alignment table. <br />3. Plans shall include spot grades adequate to describe any proposed grading. <br />4. Match lines shall not be located within the limits of an intersection. <br />5. If applicable, soil boring information shall be plotted on cross sections with soil <br />classification and high season water table. <br />6. AH quantities shall reference FDOT Pay Item Numbers. <br />7. All details shall reference FDOT Index Numbers. <br />8. All specifications shall reference to FDOT Specifications for Road and Bridge <br />Construction. Any deviations are special specifications not included in FDOT <br />Specifications are required in the Technical Specifications. <br />9. Initial, interim and Final Plan Submittal shall include the following: <br />i. Three (3) Sets of Signed and Sealed Plans. <br />ii. One (1) Opinion of Probable Construction Cost <br />iii. One (1) CD with drawings in PDF format. <br />iv. The ENGINEER will provide construction documents and calculations in <br />sufficient quantity as required by the various reviewing agencies. <br />Task 5 —Structural Analysis and Plans: <br />This scope of services is to provide structural design and contract plans for the new <br />roadway bridge along 43rd Avenue crossing over the S. Relief Canal. As part of this scope, the <br />bridge tasks will include a Bridge Development Report (BDR), 30% Plans, 90% Plans and Final <br />Plans. <br />1. 30% Bridge Plans: <br />Based on the selected bridge alternative by the County, 30% Bridge Plans will be <br />developed and submitted to the County for review which will include the following <br />sheets: <br />
The URL can be used to link to this page
Your browser does not support the video tag.