My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-162
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:23:20 AM
Creation date
9/10/2020 11:18:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/18/2020
Control Number
2020-162
Agenda Item Number
8.AQ.
Entity Name
Kinley-Horn & Associates, Inc.
Subject
43rd Avenue Bridge replacement over S. Relief Canal Work Order 33
Project Number
IRC-2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 33 <br />431d Avenue/ S. Relief Canal <br />Bridge Replacement Project <br />Task 3 — Utility Coordination: <br />The Consultant will contact all known franchise utility companies having installations in <br />the immediate vicinity of the proposed work and consider relocation of franchise utilities, if <br />necessary. The Consultant will provide the County with necessary information relative to <br />required franchise utility adjustments, relocations and installations and will show all known <br />existing franchise utilities within the construction plans. <br />Task 4 — Roadway Analysis and Plans: <br />Roadway set of plans shall consist of the following: <br />Notes: P — Preliminary, C— Complete, but subject to change, F - Final <br />The plans will be prepared based upon English units. Design will be conducted in MicroStation <br />and Geopak. <br />The following additional data shall be utilized for development of the plans: <br />1. The PROFESSIONAL will develop and submit Typical Section Packages associated with <br />the proposed bridge replacement and roadway improvement for review and approval <br />by the County prior to developing the 30% plan Construction Documents. <br />2. The bridge and roadway plans sheets will be drawn at a scale of 1" = 40' prepared on <br />30% <br />60% <br />90% <br />100% <br />Cover Sheet <br />P <br />C <br />C <br />F <br />Summary Y of Pa Items <br />P <br />C <br />F <br />Typical Sections <br />P <br />C <br />C <br />F <br />Summary of Quantities & General Notes <br />P <br />C <br />C <br />F <br />Project Layout <br />P <br />C <br />C <br />F <br />Plan and Profile Sheets (40 scale) <br />P <br />C <br />C <br />F <br />Special Details <br />P <br />C <br />F <br />Cross Sections at 100 ft intervals <br />P <br />C <br />F <br />Stormwater Pollution Prevention Plans <br />P <br />C <br />F <br />Traffic Control Plans <br />P <br />C <br />F <br />Signage & Pavement Marking Plans <br />(40 scale double plan) <br />P <br />(pavement <br />markings) <br />C <br />C <br />F <br />Structure Plans <br />P <br />C <br />F <br />Construction Cost Estimate and Quantities <br />P <br />C <br />C <br />F <br />Notes: P — Preliminary, C— Complete, but subject to change, F - Final <br />The plans will be prepared based upon English units. Design will be conducted in MicroStation <br />and Geopak. <br />The following additional data shall be utilized for development of the plans: <br />1. The PROFESSIONAL will develop and submit Typical Section Packages associated with <br />the proposed bridge replacement and roadway improvement for review and approval <br />by the County prior to developing the 30% plan Construction Documents. <br />2. The bridge and roadway plans sheets will be drawn at a scale of 1" = 40' prepared on <br />
The URL can be used to link to this page
Your browser does not support the video tag.