Laserfiche WebLink
Work Order No. 33 <br />43rd Avenue/ S. Relief Canal <br />Bridge Replacement Project <br />Each sample will be removed from the sampler in the field and then examined and visually <br />classified by our crew chief. Representative portions will be sealed and packaged for <br />transportation to our laboratory for further analysis as required. Water level observations will <br />be made in the boreholes during the drilling operation. <br />Prior to the mobilization of our drilling equipment, we will notify Sunshine State One -Call of <br />Florida, Inc. (SSOCOF) of our planned exploration to allow affected utility companies the <br />opportunity to mark the location of buried utility lines in the proposed exploration areas. The <br />locating process will require a lead time of 2 to 4 business days. <br />LABORATORY TESTING <br />We preliminarily estimate that only routine laboratory visual classification of the recovered <br />samples will be required for this project. However, gradation tests and organic content tests on <br />select samples will be performed if deemed necessary. The number of laboratory tests will be <br />determined upon completion of the soil borings and will depend on the nature of the <br />encountered soils. All laboratory tests will be performed in accordance with applicable ASTM <br />standards. <br />ENGINEERING ANALYSIS AND REPORT <br />Engineering analysis of all data obtained will be made to evaluate general subsurface conditions <br />and to develop geotechnical engineering recommendations to guide site preparation and <br />foundation design criteria for the bridge. Our recommendations as discussed above, together <br />with all the data developed during the exploration will be submitted in a written report upon <br />conclusion of the exploration. <br />