My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-166
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:26:47 AM
Creation date
9/10/2020 2:34:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/18/2020
Control Number
2020-166
Agenda Item Number
8.AW.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Ixora Park sewer system rehabilitation Amendment 1 to Work order 15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Amendment to Work Order Number 15 <br />Indian River County Department of Utility Services (IRCU) <br />Ixora Park Sewer System Rehabilitation <br />PROJECT UNDERSTANDING <br />Kimley-Horn and Associates, Inc. (the Consultant) completed a Sewer System <br />Evaluation Survey (SSES) of the condition of the existing Ixora Park sewer <br />infrastructure and recommended improvements to rehabilitate or replace <br />components of the system. <br />In response to the recommendations, IRCU has opted to replace the entire Ixora <br />Park gravity sewer system. This amendment to Work Order 15 serves to adjust the <br />scope appropriately. <br />AMENDED SCOPE OF WORK <br />TASK 1 - PHASE 2 SSES <br />The Phase 2 SSES is complete, but additional funds are required for assessing the <br />feasibility of a vacuum sewer system and review of documents provided by AirVac. <br />The Consultant will provide a summary of findings and recommendations to IRCU <br />based on our assessment of the vacuum sewer system. <br />TASK 2 -PIPE LINING AND LATERAL REHABILITATION <br />Approximately 4,100 LF of gravity sewer pipe was recommended to be cleaned and <br />lined using cast -in-place pipe (CIPP) and nine (9) laterals on these pipes were <br />recommended for rehabilitation. These pipes will instead be fully replaced, and the <br />funds previously attributed to Task 2 will be allocated to Task 3. <br />TASK 3 - FULL SEWER PIPE REPLACEMENT <br />Task 3.1 - Survey <br />Previous survey of the Ixora Park neighborhood was completed by the Consultant <br />in 2016. In addition to being outdated, this survey was solely topographic and did <br />KAWPB_Civil\044572055 - Ixora Sewer Rehab\MIS\Amendment I.doex Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.