My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-166
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:26:47 AM
Creation date
9/10/2020 2:34:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/18/2020
Control Number
2020-166
Agenda Item Number
8.AW.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Ixora Park sewer system rehabilitation Amendment 1 to Work order 15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not include survey data necessary to design a full replacement of the sewer system <br />or roadway improvements. <br />William B. Zentz and Associates, Inc. will serve as a Subconsultant on this project to <br />provide an updated survey to include survey data necessary for design by the <br />Consultant. The proposal is attached as Attachment 1. <br />Task 3.2 - Prepare Design Drawings and Specifications <br />Consultant will develop construction plans and technical specifications for full <br />replacement of the gravity sewer pipes in the Ixora Park sanitary sewer system <br />using survey provided by Subconsultant. Consultant will design roadway <br />improvements for excavated areas to address depressions in the roadway above <br />failed sewer pipe. <br />Consultant will prepare 60%, 90%, and final design drawings and specifications. <br />Consultant will attend a review meeting, respond to IRCU comments, and <br />incorporate agreed upon adjustments for the 90% and final plan sets. <br />Consultant will provide digitally signed and sealed electronic copies in PDF format <br />to comply with regulations put in place for the Coronavirus pandemic. <br />Consultant will prepare and provide an opinion of probable construction cost <br />(OPC) based on final design documents. <br />Consultant will apply for a Right -Of -Way permit on behalf of IRCU using the final <br />design documents. <br />Task 3.3 - Bidding Assistance <br />Consultant will prepare bid documents for IRCU to publicly advertise. Front-end <br />documents will be prepared and provided by IRCU. Consultant will provide <br />digitally signed and sealed electronic copies in PDF format. <br />Consultant will provide written responses to contractor requests for information <br />(RFI) related to the bid documents. Consultant will attend pre-bid meeting. <br />Consultant will review submitted contractor bids and prepare a written award <br />recommendation to IRCU. <br />KA\VPB_Civi1\044572055 - Ixora Sewer Rehab\MIS\Amendment Ldocx Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.