My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-166
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2021 10:26:47 AM
Creation date
9/10/2020 2:34:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
08/18/2020
Control Number
2020-166
Agenda Item Number
8.AW.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Ixora Park sewer system rehabilitation Amendment 1 to Work order 15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSUMPTIONS <br />• Since this work is a direct replacement, permits from FDEP are not <br />anticipated. <br />• Contractor(s) will obtain any necessary Maintenance of Traffic (MOT). <br />• Contractor(s) will obtain any necessary Dewatering Permit from the South <br />Florida Water Management District (SFWMD). <br />• Road reconstruction will be limited to the area of sewer pipe replacement. <br />• IRCU will be responsible for all permit fees and advertising costs. <br />ADDITIONAL SERVICES <br />Any services not specifically provided for in the above scope will be billed as <br />Additional Services and performed at then -current hourly rates. Additional services <br />we can provide include but are not limited to construction phase services. <br />SCHEDULE <br />In general, the following schedule is anticipated from Notice to Proceed (NTP): <br />Task 3 FULL SEWER PIPE REPLACEMENT 4 - 6 months <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Services Contract <br />Agreement for Professional Services dated April 17th, 2018, with Indian River <br />County. <br />The Consultant will provide the following adjustments to the lump sum fees <br />indicated in Work Order 15: <br />Task No. Task <br />Adjustment to Task Fee <br />TASK 1 PHASE 2 SSES <br />+$2,118 <br />TASK 2 PIPE LINING AND LATERAL REHAB <br />-$15,889 <br />TASK 3 FULL SEWER PIPE REPLACEMENT <br />+$47,421 <br />TOTAL FEE ADJUSTMENT <br />+$33,651 <br />NEW WORK ORDER 15 TOTAL <br />$113,870 <br />K:\1APB_Civil\044572055 - Ixora Sewer Rehab\MIS\Amendment l.docx Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.