Mr. Vincent Burke, P.E <br />July 27, 2020 <br />Page 5 <br />Task 6 — Supplemental Site Assessment - Time and Materials not to Exceed $16,779.24 <br />Tetra Tech will review the results of the closure assessment and site assessment activities outlined above. Based on <br />the results of this assessment, additional soil and groundwater assessment maybe required. Until the results of the <br />initial assessment are received, it is not clear what assessment will be required. The goal of the supplemental <br />assessment will be to vertically and horizontally delineate the soil concentrations in exceedance of the FDEP <br />Residential Direct Exposure Soil Cleanup Criteria and satisfy the FDEP Site Assessment Requirement outlined in <br />F.A.C. 62-780. <br />Groundwater in exceedance of FDEP GCTLs was identified in the Phase II ESA on the north side of the AST <br />containment Area. Therefore, monitoring wells are anticipated to be required in this supplemental assessment. <br />This task may include well drilling and drilling subcontractors, laboratory analysis and laboratory subcontractors, <br />field equipment, travel, field personnel, and reporting. This task will be competed, as needed, on a time and <br />materials basis not to exceed $16,779.24. Associated cost for supplemental investigations is dependent on findings <br />generated by completion of Task 1 through 4, above. <br />Task 7— Well permitting support — Time and Materials not to Exceed $2,940.70 <br />Tetra Tech will assist IRCDUS with the transfer of permits and additional compliance assistance for the Community <br />Water System well located south of the house and the five (5) artesian wells located on site. Tetra Tech <br />understands that IRCDUS began this process. This task will be completed on a time and materials basis, as needed, <br />not to exceed $2,940.70. <br />PROJECT SCHEDULE <br />The approximate duration noted for each task is based on our current understanding and best estimates of time <br />required to perform the basic services and may be subject to change upon agreement between Indian River County <br />and Tetra Tech. <br />Task <br />Timeline <br />Notice to Proceed (NTP) <br />August 20, 2020 <br />AST registration submitted to FDEP <br />September 1, 2020 <br />AST Closure Notification submitted to FDEP <br />October 1, 2020 <br />AST Closure Competed <br />January 1, 2020 <br />Draft AST Closure report submitted to IRCDUS <br />February 15, 2020 <br />Final AST Closure report submitted to FDEP (assumes 7 calendar day IRCDUS <br />review) <br />March 1, 2021 <br />Initial Site Assessment activities completed <br />February 1, 2020 <br />Draft Site Assessment Report submitted to IRCDUS <br />March 15, 2021 <br />Final Site Assessment Report submitted to FDEP (assumes 7 calendar day IRCDUS <br />review) <br />April 1, 2021 <br />Supplemental Site Assessment <br />TBD <br />ASSUMPTIONS <br />Tetra Tech's scope of services and project costs were developed with the following assumptions: <br />• Tetra Tech will review available data provided by Indian River County. <br />• Surveying services are not included. <br />• Permitting fees are not included in this proposal <br />TETRA TECH <br />