My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/23/2020 (2)
CBCC
>
Meetings
>
2020's
>
2020
>
06/23/2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2020 2:07:13 PM
Creation date
9/16/2020 11:37:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/23/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />No. 1 <br />PROJECT: Replacement of Blowers for the Sludge Holding Tank at West Regional Wastewater <br />Treatment Facility <br />DATE OF ISSUANCE June 9, 2020 EFFECTIVE DATE June 23, 2020 <br />OWNER Indian River Cou <br />OWNER's Contract No. 85883 — PO No Project No. <br />CONTRACTOR Larry Schlitt Construction, In. ENGINEER SBS <br />You are directed to make the following changes in the Contract Documents: <br />Description: Install new header/riser piping per Option 2. <br />Reason for change order: The existing header/riser piping is not properly restrained nor supported. <br />Attachments: (List documents sunnortinc chancel <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIME <br />Original Contract Price <br />4 <br />Original Contract Times <br />$ 38,100.00 <br />Substantial Completion: 30 <br />Ready for final payment: 50 <br />Days or dates <br />Net changes from previous Change Orders <br />Net change from previous Change Orders <br />No. to No. <br />No. to No. <br />$ 0.00 <br />0 days <br />Contract Price prior to this Change Order <br />Contract Time prior to this Change Order <br />$ 38,100.00 <br />Substantial Completion: 30 <br />Ready for final payment: 50 <br />Days or dates <br />Net Increase (decrease) in this Change Order <br />Net Increase in this Change Order <br />$ 15,408.00 <br />30 <br />days <br />Contract Price with all approved Change Orders <br />Contract Time with all approved Change Orders <br />$ 53,508.00 <br />Substantial Completion: 60 <br />Ready for final payment: 80 <br />Days or dates <br />RECOMMENDED: <br />By: <br />Engineer (Authorized Signature) <br />Date: <br />APPROVED: <br />By: <br />Owner (Authorized Signature) <br />Date: <br />ACCEPTED: <br />By: <br />Contractor (Authorized Signature) <br />Date: <br />EJCDC No. C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America <br />118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.